docker compose ps
Self-Hosted Apps
Longer write-ups on the self-hosted apps that are actually worth maintenance, backups, and disk space.
788 apps
Browse by category
Curated category pages, each with an overview of what the software does and which apps lead the field.
Notes & Wikis (49) Media Servers (56) Reading & RSS (51) Music (34) Communication (60) Downloads (30) Networking & VPN (45) Monitoring (42) Productivity (48) Photos (21) Containers (38) File Sync (31) CMS & Websites (23) Recipes & Health (20) Home Automation (19) Development (33) Passwords (11) Auth & SSO (19) Analytics (12) Databases (25) Ad Blocking (10) Dashboards (14) Backup (12) Finance (16) Automation (9) Security (19) Games (9) AI & ML (31)
-
2FAuth: Two-factor authentication account management and security code generator Two-factor authentication account management and security code generator.SecurityDev ToolsFinance -
389 Directory Server: Enterprise LDAP From Red Hat A high-performance LDAP server developed by Red Hat, used as the directory underneath FreeIPA and as a standalone alternative to OpenLDAP with better online management tooling.Security -
Abacus: Mobile application for Firefly III Mobile application for Firefly III. -
Activepieces: Friendly open-source all-in-one automation tool Friendly open-source all-in-one automation tool.Home Auto -
Actual Budget: Zero-Based Envelope Budgeting A local-first personal finance application implementing zero-based envelope budgeting, with fast local performance and optional end-to-end encrypted sync.FilesFinance -
AdGuard Home Manager: Unofficial AdGuard Home client created with Flutter Unofficial AdGuard Home client created with Flutter.Home AutoDev Tools -
AdGuard Home Remote: iOS Client for AdGuard Home An iOS and watchOS client for managing a self-hosted AdGuard Home instance, including pausing filtering and reviewing query logs.MonitoringHome Auto -
AdGuard Home: Network-Wide DNS Filtering A DNS server that blocks ads and trackers network-wide, with encrypted DNS support, per-client rules, and parental controls built in.Home Auto -
AdGuardian-Term: Terminal-based, real-time traffic monitoring and statistics for your AdGuard Home instance Terminal-based, real-time traffic monitoring and statistics for your AdGuard Home instance.MonitoringHome Auto -
Aegis: Android app for managing two-step authentication An open-source Android app for managing two-step authentication codes.SecurityDev Tools -
AFFiNE: Next-gen knowledge base that brings planning, sorting, and creating all together Next-gen knowledge base that brings planning, sorting, and creating all together.Productivity -
Airsonic Advanced: The Continued Subsonic Fork A Java music streaming server descended from Subsonic through Airsonic, implementing the Subsonic API so the large ecosystem of third-party clients works against it.MediaDev Tools -
Akaunting: Self-Hosted Accounting for Small Businesses and Freelancers A Laravel-based accounting application for invoices, bills, expenses, banking, and reports, with an app store for extensions such as payroll and CRM. Source-available under the Business Source License.Finance -
AList: File list/WebDAV program with support for multiple storage backends File list/WebDAV program with support for multiple storage backends.Files -
Ampache: Web-based audio and video streaming application Web-based audio and video streaming application and file manager.MediaFiles -
Amperfy: iOS app for streaming songs from Subsonic-compatible servers iOS app for streaming songs from Subsonic-compatible servers.Media -
Androtainer: Android Companion for Portainer An Android client for Portainer that manages Docker containers, checks logs, and restarts services from a phone.MonitoringDev Tools -
AnonAddy: Anonymous e-mail forwarding Anonymous e-mail forwarding.Communication -
Ansible: Simple but powerful automation for cross-platform computer support Simple but powerful automation for cross-platform computer support.Home Auto -
AnythingLLM: Chat With Your Own Documents An all-in-one RAG application that ingests documents into workspaces, embeds them into a vector database, and answers questions with citations, using local or hosted models.Dev ToolsCommunicationProductivity -
Anytype: Local-First Linked Notes With Self-Hostable Sync An encrypted, local-first knowledge tool using objects and relations rather than files, with a self-hostable sync node so the data never needs to touch a hosted service.FilesProductivity -
Apache Answer: Q&A platform for teams and communities Q&A platform for teams and communities.Communication -
AppFlowy: AI-powered secure workspace for wikis and projects AI-powered secure workspace for wikis and projects.Productivity -
Apprise: Push notifications that work with just about every Push notifications that work with just about every platform. -
Appsmith: Platform for building admin panels, internal tools, and dashboards Platform for building admin panels, internal tools, and dashboards.Monitoring -
Appwrite: Backend platform for developing web, mobile, and Flutter applications Backend platform for developing web, mobile, and Flutter applications. -
ARA: Ansible reporting via command recording Ansible reporting via command recording. -
Arcane: A Modern Web UI for Docker and Docker Compose A Docker management interface written in Go and SvelteKit for containers, Compose projects, images, networks, and volumes, with resource graphs, vulnerability scanning, and a REST API.Dev ToolsProductivity -
Arkime: Full Packet Capture You Can Actually Search Captures and indexes network traffic at scale, storing full packets alongside searchable session metadata so you can find and download the exact traffic you need weeks later.Finance -
asciinema: Platform for hosting and sharing terminal session Platform for hosting and sharing terminal session recordings.Dev Tools -
Astrysk: Unified management for self-hosted applications Unified management for self-hosted applications. -
Atheos: Browser-based cloud IDE forked from Codiad A self-hosted browser-based cloud IDE forked from Codiad.Files -
Audiobookshelf: Audiobook and Podcast Server A self-hosted server for audiobooks and podcasts with progress sync across devices, chapter support, and native mobile apps.MediaFiles -
Authelia: Lightweight Authentication and SSO Gateway A configuration-driven authentication server providing single sign-on, multi-factor authentication, and forward auth for applications behind a reverse proxy.FilesSecurity -
Authentik: Self-Hosted Identity Provider and SSO A flexible identity provider supporting OAuth2, OIDC, SAML, LDAP, and forward auth, putting one login in front of every application you run.SecurityMonitoring -
Authman: Cross-platform 2FA TOTP server with mobile and desktop apps Cross-platform 2FA TOTP server with mobile and desktop apps.Security -
autobrr: Real-Time Download Automation From IRC Announces and RSS Watches tracker IRC announce channels and RSS feeds, matches releases against your filters, and sends them instantly to qBittorrent, Deluge, Sonarr, Radarr, SABnzbd, and more. Go and React, GPL-2.0+.Home Auto -
Automad: Flat-file content management system and template Flat-file content management system and template engine.Files -
Automatisch: Automation tool for business processes and workflows Automation tool for business processes and workflows.Home Auto -
AzuraCast: Web radio management suite Web radio management suite. -
Backrest: Web UI and orchestrator for restic backup Web UI and orchestrator for restic backup.Files -
Baikal: Calendar and contacts server Calendar and contacts server.Communication -
Bar Assistant: All-in-one solution for managing your home bar All-in-one solution for managing your home bar.Home Auto -
Bareos: Enterprise Network Backup, Forked From Bacula A network backup system with director, storage and file daemons, catalogue in a database, and support for tape libraries. Built for estates where backup is a managed service rather than a cron job.FilesMonitoring -
Baserow: Open platform for creating scalable databases and applications without coding Open platform for creating scalable databases and applications without coding. -
Bazarr: Automatic Subtitle Management A companion to Sonarr and Radarr that finds, downloads, and synchronizes subtitles for your media library in the languages you choose.MediaFiles -
Beatbump: Privacy-respecting alternative frontend for YouTube Music Privacy-respecting alternative frontend for YouTube Music.Media -
BentoPDF: A Privacy-First PDF Toolkit That Runs in Your Browser More than 50 PDF tools for merging, splitting, editing, converting, compressing, and securing documents, all processed client-side in the browser so files never reach the server.FilesProductivity -
Beszel: Lightweight Server Monitoring A lightweight, self-hosted server monitoring hub with historical data, Docker container stats, and alerts, built for simplicity over configuration.MonitoringDev Tools -
BigBlueButton: Complete open-source web conferencing system Complete open-source web conferencing system.Dev Tools -
BIND 9: The Reference DNS Server The oldest and most widely deployed DNS implementation, serving as authoritative server, recursive resolver or both, and the behaviour other implementations are measured against.SecurityDev Tools -
BirdNET-Analyzer: BirdNET analyzer for scientific audio data processing BirdNET analyzer for scientific audio data processing.MediaDev Tools -
Bitmagnet: BitTorrent indexer, DHT crawler, and torrent BitTorrent indexer, DHT crawler, and torrent search engine. -
Bitwarden: Official Self-Hosted Password Manager The official self-hosted deployment of Bitwarden, an end-to-end encrypted password manager with clients on every platform and independent security audits.SecurityDev Tools -
Blocky: DNS proxy and ad-blocker for local networks DNS proxy and ad-blocker for local networks.Security -
Blue Iris: Video security and webcam software Video security and webcam software.Media -
BookLogr: Self-Hosted Personal Library Tracker A self-hosted web application for cataloguing books you own, tracking reading progress, and keeping a personal reading history without a commercial reading platform.MediaMonitoringDev ToolsProductivity -
BookLore: A Self-Hosted Library for E-Books and Comics A multi-user digital library with smart shelves, automatic metadata, a BookDrop import folder, OPDS, Kobo and KOReader sync, and a built-in reader for EPUB, PDF, and comics. AGPL-3.0, now in maintenance mode.MediaFilesHome AutoDev ToolsProductivity -
BookStack: Platform for organizing and storing information in a book-like structure Platform for organizing and storing information in a book-like structure.MediaProductivity -
Borg: Deduplicating archiver with compression and encryption Deduplicating archiver with compression and encryption. -
BudgetBee: Personal finance management system Personal finance management system.Finance -
Budibase: Low-code platform for building business apps and workflows in minutes Low-code platform for building business apps and workflows in minutes.Dev Tools -
BunkerWeb: Next-generation and open-source web application Next-generation and open-source web application firewall.Security -
Cacti: RRDtool Graphing With a Web Front End A long-established graphing platform wrapping RRDtool and SNMP polling in a web interface, built for interface and device graphs rather than alerting.Monitoring -
Caddy: Web Server With Automatic HTTPS A modern web server and reverse proxy that obtains and renews TLS certificates automatically, configured in a few lines rather than a few dozen.Security -
Cal.com: Scheduling infrastructure for absolutely everyone Scheduling infrastructure for absolutely everyone. -
Calibre-Web: Web application for browsing, reading, and downloads book stored in a Calibre database Web application for browsing, reading, and downloads book stored in a Calibre database.MediaProductivity -
Calorific: Simple self-hosted calorie tracking Simple self-hosted calorie tracking. -
CapRover: A Self-Hosted Heroku on Docker Swarm A platform-as-a-service that deploys apps and databases on your own servers with Docker Swarm and nginx, one-click app templates, free Let's Encrypt certificates, and a web UI and CLI.SecurityDev Tools -
CasaOS: Home Cloud Operating System A simple, app-store-driven home cloud system that layers a friendly web interface and one-click Docker app installs on top of an existing Linux install.FilesHome AutoDev Tools -
Casdoor: Open-source, UI-first identity access management Open-source, UI-first identity access management.Security -
Castopod: Open-source hosting platform for podcasters who Open-source hosting platform for podcasters who want to engage and interact with their audience.Media -
Ceph: Unified Distributed Storage A distributed storage system providing object, block and file access from one cluster with no single point of failure, and the storage layer underneath many private clouds.Files -
Cert Warden: Centralized certificate management for secure infrastructure Centralized certificate management for secure infrastructure.Security -
ChangeDetection: Page change monitoring with alerts Page change monitoring with alerts.Monitoring -
Channels DVR: Flexible, standalone media server that lets you Flexible, standalone media server that lets you watch TV your way.Media -
Checkmk: Scalable Infrastructure Monitoring With Auto-Discovery A comprehensive IT monitoring system for servers, networks, VMs, containers, and cloud, with agent-based and agentless checks, automatic service discovery, and hundreds of plugins. The Community edition is GPL-2.0.FilesMonitoring -
Chevereto: Image hosting and sharing software Image hosting and sharing software. -
Chirpy: Privacy-friendly and customizable commenting Privacy-friendly and customizable commenting system. -
Chromatix: Desktop Music Player for Plex A desktop music player for Plex libraries, offering a native listening experience on macOS and Windows instead of the browser interface.Media -
circled.me: Photo, chat, and sharing community server Photo, chat, and sharing community server.MediaDev ToolsCommunication -
ClickHouse: Column-oriented database management system for generating analytical data reports in real-time Column-oriented database management system for generating analytical data reports in real-time. -
Clipious: Invidious client for Android Invidious client for Android. -
Cloudflared: Tunneling daemon for proxying traffic from the Cloudflare network Tunneling daemon for proxying traffic from the Cloudflare network.FilesSecurity -
Cockpit: Web Console for Linux Servers A browser-based administration interface for Linux servers covering services, storage, networking, logs, containers, and updates, with no agent or persistent daemon required.FilesMonitoring -
code-server: Code on any device with a consistent development Code on any device with a consistent development environment.Dev Tools -
Coder: Provision remote development environments via Terraform Provision remote development environments via Terraform.Dev Tools -
Collabora Online: LibreOffice in the Browser for Nextcloud and Beyond A web office suite built on LibreOffice for collaborative editing of documents, spreadsheets, and presentations, usually paired with Nextcloud, OpenCloud, or Seafile. The free CODE edition is ideal for homes and small teams.FilesHome AutoDev ToolsCommunicationProductivity -
ComfyUI: Node-Based Stable Diffusion Interface A powerful, modular diffusion model GUI with a node-based graph interface, plus an API and backend for running image and video generation entirely on your own hardware.MediaDev Tools -
ComicTagger: Multi-platform app for writing metadata to digital Multi-platform app for writing metadata to digital comics.Dev Tools -
CommaFeed: Google Reader inspired self-hosted RSS aggregator Google Reader inspired self-hosted RSS aggregator.Productivity -
Commento: Fast, privacy-focused commenting platform Fast, privacy-focused commenting platform. -
Continuwuity: A Community Matrix Homeserver in Rust The community-driven continuation of the archived conduwuit Matrix server: lightweight, fast, written in Rust with RocksDB, and a drop-in replacement for conduwuit. A low-resource alternative to Synapse.FilesHome AutoCommunication -
Converse: Web-based XMPP/Jabber chat client Web-based XMPP/Jabber chat client.Communication -
ConvertX: A Self-Hosted File Converter for 1000+ Formats A web file converter that wraps FFmpeg, LibreOffice, ImageMagick, Pandoc, Calibre, Inkscape and more behind one interface, with batch conversion and user accounts.FilesFinance -
Coolify: Self-Hosted PaaS and Heroku Alternative An open-source, self-hostable platform-as-a-service for deploying applications, databases, and 280+ one-click services to your own servers.Dev Tools -
Copyparty: A Portable File Server That Speaks Every Protocol A single-file Python file server with resumable, deduplicated uploads through the browser, plus WebDAV, SFTP, FTP, TFTP, and SMB access, media thumbnails, and an audio player.MediaFiles -
Cosmos: Home server application gateway and manager Home server application gateway and manager.Home Auto -
CouchDB: A Document Database Built Around Replication A document store whose defining feature is multi-master replication over HTTP, designed so that offline devices can sync and merge changes when they reconnect.FilesProductivity -
Counter: Web analytics made simple and privacy-friendly Web analytics made simple and privacy-friendly.Monitoring -
Crafty Controller: A Web Panel for Minecraft Java and Bedrock Servers A self-hosted control panel for running and managing Minecraft servers, with Java and Bedrock support, backups, scheduled tasks, a file manager, and multiple users with role-based permissions.FilesProductivity -
CrowdSec: Open-source and participative security solution Open-source and participative security solution offering crowd-sourced protection against malicious IPs.Dev Tools -
CryptPad: End-to-end encrypted and open-source collaboration End-to-end encrypted and open-source collaboration suite. -
CTFreak: Centralized task management, scheduling, and notifications Centralized task management, scheduling, and notifications.Productivity -
CyberChef: The Cyber Swiss Army Knife for Encoding, Decoding, and Data Analysis GCHQ's browser-based tool for chaining hundreds of operations, from Base64 and hex to encryption, compression, hashing, and data extraction, entirely client-side. Self-hostable as static files or a container.FilesMonitoring -
Czkawka: Multi-functional application for finding and removing duplicates, empty folders, and similar files Multi-functional application for finding and removing duplicates, empty folders, and similar files.Files -
Damselfly: Server-based photograph management app Server-based photograph management app.Media -
DaRemote: Android Server Monitoring and Management An Android application for monitoring Linux servers and managing services, containers, and downloads through SSH and API integrations.MonitoringDev Tools -
Dashy: Personal dashboard with status-checking, widgets, themes, icon packs, and a UI editor Personal dashboard with status-checking, widgets, themes, icon packs, and a UI editor.Monitoring -
DAViCal: Calendar storage and sharing Calendar storage and sharing.FilesCommunication -
DAVx⁵: CalDAV/CarDAV suite and sync app for Android CalDAV/CarDAV suite and sync app for Android.Files -
Dawarich: Self-hosted alternative to Google Location History Self-hosted alternative to Google Location History. -
ddclient: Update dynamic DNS entries for accounts on a wide Update dynamic DNS entries for accounts on a wide range of dynamic DNS services.Finance -
DDNS Updater: Periodic DNS record updates across a number of DNS Periodic DNS record updates across a number of DNS providers. -
DefectDojo: Managing Findings From Every Security Scanner Aggregates output from more than a hundred security tools into one place, deduplicating findings across scans and tracking them through triage and remediation.Media -
DefGuard: Enterprise, fast, secure VPN & SSO platform with support for hardware keys and 2FA/MFA Enterprise, fast, secure VPN & SSO platform with support for hardware keys and 2FA/MFA.Security -
Deluge: Lightweight BitTorrent Client A free, cross-platform BitTorrent client with a plugin system and a client-server architecture that separates the daemon from the interface. -
Dendrite: A Lighter Second-Generation Matrix Server The Matrix.org Foundation Go homeserver, written as a lighter successor to Synapse with a focus on lower resource use, though Synapse remains the reference implementation.SecurityHome AutoCommunication -
Dex: An OpenID Connect Bridge to Existing Identity A small federated OIDC provider that authenticates against upstream identity sources such as LDAP, SAML or GitHub, giving applications a single OIDC endpoint to integrate with.MediaSecurityDev Tools -
Dify: Building LLM Applications Without Writing the Plumbing A platform for building AI applications with a visual workflow editor, RAG pipeline, agent tooling, and prompt management, exposing what you build as an API.Dev Tools -
Dim: Media manager and organizer with a minimal setup Media manager and organizer with a minimal setup.Media -
Directus: Headless CMS for Any SQL Database An instant REST and GraphQL API plus a full admin app layered on top of any existing SQL database, no schema migration required.Dev Tools -
Discourse: Platform for community discussion A platform for community discussion. -
Dittofeed: Omni-channel customer engagement platform for messaging users across multiple channels Omni-channel customer engagement platform for messaging users across multiple channels. -
Diun: What You Need to Know: Receive notifications when an image is updated on a Docker registry Receive notifications when an image is updated on a Docker registry.Dev Tools -
Docassemble: System for guided interviews and document assembly System for guided interviews and document assembly.Productivity -
Dockcheck: CLI tool to automate Docker image updates CLI tool to automate Docker image updates.Dev Tools -
Docker Controller Bot: Telegram bot for managing Docker containers Telegram bot for managing Docker containers.Dev Tools -
Docker Registry Browser: Web interface for the Docker Registry HTTP API Web interface for the Docker Registry HTTP API.Dev Tools -
Docker Socket Proxy: Docker socket proxy for restricting requests to the Docker API Docker socket proxy for restricting requests to the Docker API.SecurityDev Tools -
Docker Volume Backup: Backup Docker volumes locally or to a number of compatible storage protocols Backup Docker volumes locally or to a number of compatible storage protocols.FilesDev Tools -
docker-mailserver: A Full Mail Server in One Container, Configured by Files A production-ready mail server container with Postfix, Dovecot, Rspamd, SpamAssassin, ClamAV, Fail2ban, and DKIM, managed through configuration files and a setup script rather than a web UI. MIT licensed.FilesDev ToolsCommunicationProductivity -
Dockge: Easy-to-use docker compose stack manager Easy-to-use docker compose stack manager.Dev Tools -
Docmost: Collaborative documentation and wiki software Collaborative documentation and wiki software.Productivity -
Docspell: What You Need to Know: Organize documents sourced from scanners, e-mail, and other sources Organize documents sourced from scanners, e-mail, and other sources.CommunicationProductivity -
Documenso: An Open Source DocuSign Alternative A self-hostable document signing platform with PAdES-compliant digital signatures, email routing to signers, templates, and a developer API. AGPL-3.0, PostgreSQL-based.Dev ToolsCommunicationProductivity -
Docusaurus: Easy to maintain open-source documentation Easy to maintain open-source documentation websites.Productivity -
DocuSeal: Create, fill, and sign digital documents Create, fill, and sign digital documents.Dev ToolsProductivity -
Dokku: git push Deployments on Your Own Server A Docker-powered mini Heroku that builds and runs apps from git push using buildpacks or Dockerfiles, with a plugin system for databases and Let's Encrypt certificates.FilesSecurityDev Tools -
Dokploy: Lightweight Self-Hosted PaaS A self-hosted deployment platform built on Docker Swarm and Traefik, deploying applications, databases, and Compose stacks with automatic HTTPS from a clean web interface.Dev Tools -
DokuWiki: Open-source wiki engine Open-source wiki engine.Productivity -
Domoticz: A Light C++ Home Automation Server A compact home automation system written in C++, notable for running comfortably on very modest hardware such as an older Raspberry Pi where the JVM and Python alternatives struggle.Home Auto -
Double Take: Unified UI and API for processing and training Unified UI and API for processing and training images for facial recognition.Dev Tools -
Dovecot: Secure IMAP mail server Secure IMAP mail server.Communication -
Dozzle: Real-time log viewer for Docker containers Real-time log viewer for Docker containers.MonitoringDev Tools -
draw.io: Client-side editor for general diagramming Client-side editor for general diagramming. -
DroidHole: Unofficial Pi-hole client developed with Flutter Unofficial Pi-hole client developed with Flutter.Dev Tools -
Drone: Container-Native CI With a Licence Change to Read A continuous integration system where every pipeline step runs in a container, configured by a YAML file in the repository. Now under a source-available licence, which produced the Woodpecker fork.FilesDev ToolsProductivity -
Dub: Open-source link management infrastructure for modern marketing teams Open-source link management infrastructure for modern marketing teams.Communication -
Duplicacy: New generation cross-platform cloud backup tool based on lock-free deduplication New generation cross-platform cloud backup tool based on lock-free deduplication.Files -
Duplicati: Store securely encrypted backups in the cloud Store securely encrypted backups in the cloud.Files -
DweebUI: Management interface for Docker containers Management interface for Docker containers.Dev Tools -
Dynacat: A Glance-Based Dashboard With Live Reloading and a UI Editor A fork of the Glance dashboard focused on dynamic content reloading and integration with external apps. Version 3.0 added a UI-based configuration editor alongside YAML.Monitoring -
EasyMQTT: Simple MQTT Client A straightforward MQTT client for inspecting topics, publishing test messages, and debugging message flow in home automation setups.Home Auto -
ejabberd: A Battle-Tested XMPP Server An Erlang XMPP server built for very large deployments, handling millions of concurrent connections, with clustering, MUC, push notifications and a MQTT and SIP gateway.Home AutoDev Tools -
Elasticsearch: Search and Analytics With a Licence Question The search engine that defined the category, now offered under AGPL, SSPL or a commercial licence after a relicensing that produced the OpenSearch fork.MonitoringDev Tools -
Element: The Flagship Matrix Client You Can Self-Host Element Web is the main web client for the Matrix chat network, with end-to-end encrypted rooms, spaces, voice and video calls, and bridges. Self-host it as static files pointed at your own homeserver. AGPL-3.0 or GPL-3.0.MediaFilesMonitoringHome AutoCommunication -
Eleventy: Simple static site generator that transforms a directory of templates into HTML Simple static site generator that transforms a directory of templates into HTML.Monitoring -
Emby: Media server designed to organize, play, and stream audio and video to a variety of devices Media server designed to organize, play, and stream audio and video to a variety of devices.Media -
Endless: Social media curator Social media curator.MediaDev Tools -
Endurain: Fitness tracking service Fitness tracking service. -
Ente Auth: Open-source, end-to-end encrypted 2FA platform Open-source, end-to-end encrypted 2FA platform.Security -
Ente Photos: Fully open-source, end-to-end encrypted Fully open-source, end-to-end encrypted alternative to Google Photos and Apple Photos.Media -
Envoy: A Programmable L7 Proxy and Service Mesh Data Plane A high-performance proxy designed for dynamic configuration over APIs, used as an edge proxy, a sidecar in service meshes, and the data plane underneath several API gateways.SecurityDev Tools -
ERPNext: Open Source ERP for Accounting, Inventory, and Manufacturing A full enterprise resource planning system built on the Frappe framework, covering accounting, sales and purchasing, inventory, manufacturing, assets, projects, and HR. GPL-3.0, self-hosted with Docker or Frappe Cloud.FilesDev ToolsFinanceProductivity -
ErsatzTV: Configure and stream custom live channels from a media library Configure and stream custom live channels from a media library.Media -
ESPHome: System to control your ESP8266/ESP32 with simple yet powerful configuration files System to control your ESP8266/ESP32 with simple yet powerful configuration files.FilesHome Auto -
EspoCRM: A Fast, Extensible Open Source CRM A customer relationship manager with contacts, accounts, opportunities, cases and a configurable entity model, notable for being quick and for letting you add custom entities without writing code.Dev ToolsCommunicationFinance -
EteSync: Secure syncing for contacts, calendars, tasks, and notes Secure syncing for contacts, calendars, tasks, and notes.FilesDev ToolsCommunicationProductivity -
Etherpad: Real-Time Collaborative Writing With Full Authorship History A lightweight collaborative editor where many people type in the same document at once, with author colours, a character-by-character timeslider, hundreds of plugins, and no telemetry. Apache 2.0.SecurityProductivity -
EverShop: Modular and fully customizable e-commerce platform Modular and fully customizable e-commerce platform. -
Excalidraw: Virtual whiteboard for sketching hand-drawn like Virtual whiteboard for sketching hand-drawn like diagrams. -
Exercise Diary: Workout diary with GitHub-style yearly Workout diary with GitHub-style yearly visualization.Dev Tools -
Fail2Ban: Daemon to ban hosts that cause multiple authentication errors Daemon to ban hosts that cause multiple authentication errors.Security -
Fasten Health: What You Need to Know: Open-source personal medical record aggregator Open-source personal medical record aggregator with provider integration. -
Feedbase: Open-source solution for collecting feedback and communicating updates Open-source solution for collecting feedback and communicating updates. -
FeedCord: RSS reader with Discord integration RSS reader with Discord integration.CommunicationProductivity -
FeedMe: Android Reader for Self-Hosted RSS Services An Android RSS client that syncs with self-hosted feed servers including FreshRSS, Tiny Tiny RSS, and Miniflux, with offline reading and gesture navigation.FilesProductivity -
Feishin: Modern self-hosted desktop music player Modern self-hosted desktop music player.Media -
Fenrus: Personal home page for quick access to personal apps and sites Personal home page for quick access to personal apps and sites.Home Auto -
FileBrowser: File managing interface for specified directories File managing interface for specified directories.FilesDev Tools -
FileFlows: File processing application for executing actions File processing application for executing actions against a file in a tree flow structure.Files -
FileRun: Access your files anywhere through self-hosted Access your files anywhere through self-hosted secure cloud storage.Files -
Filestash: Modern web client and file manager with support Modern web client and file manager with support for a number of storage backends.Files -
Finamp: Jellyfin music client for mobile Jellyfin music client for mobile.Media -
Findroid: Third-party native Jellyfin Android app Third-party native Jellyfin Android app.Media -
Fintunes: Beautiful and minimalistic streaming music player Beautiful and minimalistic streaming music player powered by Jellyfin.Media -
Firefly III: Personal finance management and budgeting Personal finance management and budgeting.Finance -
Firefly-Pico: Firefly III companion web app for effortless Firefly III companion web app for effortless transaction tracking. -
Fireshare: Share your game clips, videos, or other media via unique links Share your game clips, videos, or other media via unique links.MediaFiles -
Firezone: Zero-Trust Remote Access Built on WireGuard A remote access platform using WireGuard tunnels with identity-based policies, device verification, and audit logs, with clients for every major platform. The source is public, but production self-hosting of the control plane is not officially supported.SecurityMonitoringDev Tools -
Fitbit Health Dashboard: Script for FitBit data retrieval, storage, and visualization Script for FitBit data retrieval, storage, and visualization.FilesMonitoring -
FitTrackee: Self-hosted outdoor activity tracker Self-hosted outdoor activity tracker. -
Flame: Self-hosted start page for servers with support Self-hosted start page for servers with support for applications and bookmarks.MediaProductivity -
FlareSolverr: Proxy server to bypass Cloudflare protection Proxy server to bypass Cloudflare protection.FilesSecurity -
Flarum: Simple forum software for building great Simple forum software for building great communities. -
Floccus: Sync your bookmarks privately across browsers and devices Sync your bookmarks privately across browsers and devices.MediaFilesProductivity -
Flood: A Modern Interface for Several Torrent Clients A React web interface that connects to rTorrent, qBittorrent or Transmission, giving a consistent modern front end regardless of which engine is doing the work. -
Flowise: Drag-and-Drop LLM Workflows A visual builder for chaining language models, retrieval, and tools into working applications, with the result deployable as an API or an embeddable chat widget.Dev ToolsCommunication -
Flox: Self-hosted movie, series, and anime watch list Self-hosted movie, series, and anime watch list.Media -
Focalboard: Kanban and Project Boards, Now Community Maintained A Trello and Notion-style project board with kanban, table, gallery and calendar views, originally built by Mattermost and now continued by the community after development was discontinued.MediaCommunicationProductivity -
Forgejo: Lightweight software forge Lightweight software forge.Dev Tools -
FreeIPA: Integrated Identity Management for Linux An integrated identity and authentication server bundling LDAP, Kerberos, DNS, a certificate authority and host-based access control into one managed domain for Linux fleets.Security -
FreshRSS: Self-Hosted RSS Aggregator A fast, lightweight RSS and Atom feed aggregator with multi-user support, an extension system, and API compatibility with a wide range of mobile clients.Dev Tools -
Frigate-Notify: Event notifications for a standalone Frigate NVR Event notifications for a standalone Frigate NVR instance. -
Frigate: Local Object Detection NVR A network video recorder that runs real-time AI object detection locally on your camera feeds, alerting on people and vehicles rather than every moving shadow.MediaMonitoring -
frp: Expose Services Behind NAT With a Fast Reverse Proxy Tunnel A reverse tunnel that exposes services on a home network or behind CGNAT through a server with a public IP, supporting TCP, UDP, HTTP, HTTPS, secret STCP tunnels, and P2P XTCP. Configured in TOML. Apache 2.0.SecurityHome Auto -
FTPGrab: Easily grab files periodically from a remote FTP Easily grab files periodically from a remote FTP or SFTP server.Files -
Funkwhale: Federated Music Hosting and Sharing A music server that federates over ActivityPub, so libraries and channels can be followed across instances, combining personal music hosting with podcast support and social discovery.MediaDev Tools -
FusionAuth: Customer authentication and authorization platform for making developers' lives awesome Customer authentication and authorization platform for making developers' lives awesome.Security -
Games on Whales: Stream virtual desktops and games via Docker Stream virtual desktops and games via Docker.MediaDev Tools -
GameVault: Self-Hosted Game Library Platform A self-hosted platform for hosting and distributing your own DRM-free game library, with clients that install and update titles like a store would.Security -
Garage: S3-compatible object store for self-hosted S3-compatible object store for self-hosted geo-distributed deployments.Dev Tools -
Gaseous: ROM file and metadata manager with a web-based emulator ROM file and metadata manager with a web-based emulator.Files -
Gatsby: Framework for building blazing fast websites and apps Framework for building blazing fast websites and apps. -
Gatus: Automated developer-oriented status page Automated developer-oriented status page.Monitoring -
Gelli: What You Need to Know: Native music player for Jellyfin Native music player for Jellyfin.Media -
Gerrit: Code Review Built Around Single Commits A review system where each commit is reviewed independently and amended in place rather than accumulating in a branch, used by Android, Chromium and the Go project.Dev ToolsProductivity -
Ghost: Independent technology for modern publishing, memberships, subscriptions and newsletters Independent technology for modern publishing, memberships, subscriptions and newsletters.Monitoring -
Ghostfolio: Open-source wealth management software Open-source wealth management software. -
Git-Sync: Backup and sync tool for git repositories Backup and sync tool for git repositories.FilesDev Tools -
Gitea: Lightweight Self-Hosted Git Service A fast, low-resource Git hosting service with issues, pull requests, a package registry, and built-in CI, written in Go and deployable as a single binary.Dev Tools -
GitLab: Complete Self-Hosted DevOps Platform A full DevOps platform combining Git hosting, CI/CD, container registry, issue tracking, and security scanning in one self-hostable application.Dev Tools -
Gitleaks: Finding Secrets Before They Reach a Repository Scans code and Git history for hardcoded credentials, API keys, and tokens, runnable as a pre-commit hook so secrets are caught before the commit rather than after the leak.SecurityDev Tools -
Gitpod: Ephemeral Development Environments From a Repository A system that builds a containerised development environment from a file in your repository, so a working checkout with tools installed is created on demand and thrown away afterwards.FilesDev Tools -
Glance: A Fast, Config-Driven Homelab Dashboard A self-hosted dashboard that puts feeds, service status, weather, and server stats on one fast page, configured entirely through YAML.FilesMonitoringHome Auto -
Glances: A Cross-Platform System Monitor for the Terminal, Web, and API An htop-style monitor showing CPU, memory, disks, network, sensors, processes, and containers, available as a terminal UI, web interface, and REST API, with exporters for Prometheus, InfluxDB, and more. LGPL-3.0.MonitoringHome AutoDev Tools -
GlitchTip: Lightweight Error Tracking Compatible With Sentry SDKs An open source error tracking platform that accepts events from Sentry client libraries, with performance monitoring, uptime checks, and alerts, at a fraction of Sentry's self-hosting footprint. MIT licensed.Monitoring -
GLPI: Asset and IT management software package, data center management, service desk, license tracking, and software auditing Asset and IT management software package, data center management, service desk, license tracking, and software auditing. -
Gogs: Painless self-hosted git service Painless self-hosted git service.Dev Tools -
Gokapi: Lightweight server for sharing files that expire Lightweight server for sharing files that expire after a configured amount of downloads or days.FilesDev Tools -
GoProxy: Automatic Docker Reverse Proxy A lightweight reverse proxy written in Go that discovers Docker containers automatically and routes traffic to them without manual configuration.SecurityDev Tools -
Gotify: Simple server for sending and receiving messages Simple server for sending and receiving messages in real-time via WebSocket. -
GoToSocial: Fast, fun, small ActivityPub server Fast, fun, small ActivityPub server.Dev Tools -
Grafana: Metrics Dashboards and Visualization The standard open-source dashboard layer for time-series data, querying Prometheus, InfluxDB, Loki, and dozens of other sources into one visual interface.Monitoring -
Grav: Fast, simple, and flexible file-based web-platform Grav is a fast, simple, and flexible file-based web-platform.Files -
Gravity: Fully-replicated DNS and DHCP server with ad-blocking powered by etcd Fully-replicated DNS and DHCP server with ad-blocking powered by etcd. -
Graylog: Centralized Log Management A centralized log management platform that ingests, parses, indexes, and searches logs from across your infrastructure, with dashboards, alerting, and long-term archiving.Monitoring -
Greenbone Community Edition: Network Vulnerability Scanning The open-source vulnerability scanner formerly known as OpenVAS, probing hosts on your network for known vulnerabilities, misconfigurations, and exposed services. -
Grimoire Companion: Add bookmarks to a Grimoire account directly from the browser Add bookmarks to a Grimoire account directly from the browser.MediaFinanceProductivity -
Grimoire: Bookmark manager for wizards Bookmark manager for wizards.MediaProductivity -
Grist: Modern relational spreadsheets Modern relational spreadsheets.Productivity -
Grocy: Web-based groceries and household management solution for the home Web-based groceries and household management solution for the home.Home Auto -
Grype: Vulnerability Scanning for Images and Filesystems A focused vulnerability scanner from the Anchore project that pairs with Syft for SBOM generation, scanning container images and directories against known vulnerability data.FilesProductivity -
Guacamole: Clientless remote desktop gateway Clientless remote desktop gateway. -
HA Kiosk: Kiosk Mode App for Home Assistant A simple kiosk application that displays a Home Assistant dashboard full-screen on a wall tablet, with screen management and no browser chrome.MonitoringHome Auto -
HAProxy: Fast and reliable reverse-proxy offering high availability, load balancing, and proxying for TCP and HTTP-based applications Fast and reliable reverse-proxy offering high availability, load balancing, and proxying for TCP and HTTP-based applications.SecurityDev Tools -
Harbour: Docker/Portainer management app for iOS Docker/Portainer management app for iOS.Dev Tools -
Headscale: Open-source implementation of the Tailscale Open-source implementation of the Tailscale control server. -
Healthchecks: Cron Job and Background Task Monitoring A dead man's switch for scheduled tasks: jobs ping a URL when they finish, and Healthchecks alerts you when a ping does not arrive on time.MonitoringProductivity -
HedgeDoc: Real-time and collaborative Markdown notes Real-time and collaborative Markdown notes.Productivity -
Heimdall: Dashboard for web applications and links Dashboard for web applications and links.Monitoring -
Helmarr: iOS Companion for Sonarr and Radarr An iOS companion app for monitoring Sonarr and Radarr queues, calendars, and history from a phone, connecting to instances you host yourself.MonitoringCommunication -
HeyForm: Open-source form builder that allows anyone to create engaging conversational forms for surveys, questionnaires, quizzes, and polls Open-source form builder that allows anyone to create engaging conversational forms for surveys, questionnaires, quizzes, and polls. -
HiveDAV: Curlable free/busy scheduler with CalDAV Curlable free/busy scheduler with CalDAV integration. -
Homarr iFrames: Application iFrames for display in Homarr Application iFrames for display in Homarr. -
Homarr: Customizable home page with integration support Customizable home page with integration support for Docker containers.Home AutoDev Tools -
Home Assistant: Local-First Home Automation An open-source home automation platform that controls devices locally across thousands of integrations, keeping automations running when the internet is down.Home Auto -
Homebox: Home Inventory and Organization System A simple, fast home inventory and organization system for tracking what you own, where it is, and what it is worth.Home Auto -
Homebridge: HomeKit Support for Everything Else A lightweight server that emulates the HomeKit API so devices without native support appear in Apple Home, extended by thousands of community plugins.Home AutoDev Tools -
Homepage: What You Need to Know: Customizable homepage with Docker and service API Customizable homepage with Docker and service API integrations.Home AutoDev Tools -
Homer: What You Need to Know: Simple static homepage for server applications Simple static homepage for server applications.MonitoringHome Auto -
Honey: Simple Dashboard for Self-Hosted Services A minimal self-hosted dashboard that collects links to the services you run into one clean start page.Monitoring -
Hoppscotch: An Open Source Postman Alternative You Can Self-Host A fast, lightweight API development platform for REST, GraphQL, WebSocket, Server-Sent Events, Socket.IO, and MQTT, with collections, environments, scripting, team workspaces, and web, desktop, and CLI clients. MIT licensed.Home AutoDev ToolsCommunication -
HortusFox: Collaborative plant management system Collaborative plant management system. -
Huginn: System for building agents that perform automated System for building agents that perform automated online tasks.Productivity -
Hugo: Fast and flexible static site generator built with love Fast and flexible static site generator built with love.Monitoring -
HumHub: Open-source enterprise social network, knowledge Open-source enterprise social network, knowledge database, intranet, and communication platform.Dev ToolsProductivity -
Icinga 2: Monitoring With a Configuration Language A Nagios-compatible monitoring system rewritten with its own configuration DSL, distributed checks and a modern web interface, retaining compatibility with the vast library of Nagios plugins.MonitoringDev Tools -
Immich: Self-Hosted Google Photos Alternative A high-performance photo and video backup platform with mobile auto-backup, facial recognition, object search, and a timeline interface that matches commercial services.MediaFilesDev Tools -
Infisical: Secrets Management With a Usable Interface An open-source secrets platform with a web UI, CLI, and integrations for injecting secrets into applications, plus secret scanning to catch credentials before they reach a repository.Security -
InfluxDB: Scalable datastore for metrics, events, and real-time analytics Scalable datastore for metrics, events, and real-time analytics.Monitoring -
Infuse: Elegant video player for videos stored across a number of platforms Elegant video player for videos stored across a number of platforms.Media -
InvenTree: Open Source Inventory and Parts Management An inventory management system for parts, stock locations, bills of materials, suppliers, and purchase orders, with a REST API, plugins, and a mobile app. Popular with makers, labs, and small manufacturers. MIT licensed.Dev Tools -
Invidious: Alternative front-end for YouTube Alternative front-end for YouTube. -
Invoice Ninja: Simple invoicing, multiple payment options, expense and vendor management, and more! Simple invoicing, multiple payment options, expense and vendor management, and more!.Dev ToolsFinance -
InvokeAI: A Refined Interface for Stable Diffusion A creative tool built around a unified canvas for generating and editing images locally, with node-based workflows available underneath for people who want them. -
iQbit: IOS-styled mobile web UI for qBittorrent iOS-styled mobile web UI for qBittorrent. -
IT Tools: Self-Hosted Developer Utility Collection A single web application collecting dozens of everyday developer utilities, from encoders and generators to formatters and converters, running entirely in your browser.Dev Tools -
Jackett: API support for torrent trackers API support for torrent trackers.Dev Tools -
Jaeger: Distributed Tracing for Request Paths A tracing backend that collects spans from instrumented services and reconstructs the full path of a request across them, showing where the latency actually accumulated.Dev ToolsFinance -
Jan: A Local-First Desktop AI Assistant An open-source desktop application for running language models locally, with a familiar chat interface, a model hub, and an OpenAI-compatible local API server.Dev ToolsCommunication -
Jekyll: Simple, blog-aware static site generator Simple, blog-aware static site generator.Monitoring -
JellyBook: Book and comic reader for Jellyfin Book and comic reader for Jellyfin.MediaProductivity -
Jellybox: Native Client for Jellyfin A native desktop and mobile client for Jellyfin, offering better playback and library browsing than the browser interface.Media -
Jellyfin Rewind: Year-in-review app for Jellyfin music listeners A year-in-review app for Jellyfin music listeners.Media -
Jellyfin: The Free Software Media Server A fully free media server that organizes and streams your film, TV, music, and book collections to any device, with no subscription tier, no account requirement, and no telemetry.MediaFinance -
Jellyseerr: Media Request Manager for Jellyfin and Plex A request interface that lets household members ask for films and shows, then hands approved requests to Sonarr and Radarr automatically.Media -
Jellystat: Free and open-source statistics app for Jellyfin Free and open-source statistics app for Jellyfin.MediaMonitoring -
Jenkins: The Long-Standing Automation Server The most widely deployed open-source automation server for continuous integration and delivery, with a plugin ecosystem covering nearly every build tool, platform, and deployment target.Home AutoDev Tools -
Jitsi Meet: Secure, simple, and scalable video conferences as a standalone or web application Secure, simple, and scalable video conferences as a standalone or web application.Media -
Kanboard: Kanban project management software Kanban project management software.Productivity -
Kanidm: Modern and simple identity management platform Modern and simple identity management platform.Security -
Kapowarr: Comic Book Library Manager A self-hosted manager for comic book libraries that tracks volumes, finds missing issues, and integrates with download clients in the style of the *arr applications.Media -
Karakeep (formerly Hoarder): Bookmark Everything With AI Tagging A self-hostable bookmark-everything app for links, notes, images, and PDFs, with AI-based automatic tagging and full text search. Renamed from Hoarder in 2025.MediaProductivity -
Kavita: Fast and feature-rich cross-platform reading Fast and feature-rich cross-platform reading server.Productivity -
kbin: Reddit-like content aggregator and microblogging A reddit-like content aggregator and microblogging platform for the Fediverse.Monitoring -
KeePassXC: Modern, secure, and open-source password manager that stores and manages sensitive information Modern, secure, and open-source password manager that stores and manages sensitive information.Security -
Keila: Open-source newsletter tool Open-source newsletter tool. -
Keycloak: Open-source identity and access management for applications and services Open-source identity and access management for applications and services.Security -
Khoj: A Personal AI That Searches Your Own Notes Connects a language model to your documents, notes, and email so you can ask questions about your own material, with support for Obsidian, Notion, and local files.FilesCommunicationProductivity -
Kill-the-Newsletter: Convert email newsletters into Atom feeds Convert email newsletters into Atom feeds.Communication -
Kimai: Time Tracking for Freelancers and Teams A web-based time tracking application for logging billable hours against customers, projects, and activities, with invoicing, exports, and detailed reporting.MonitoringDev ToolsCommunicationProductivity -
KitchenOwl: Self-hosted grocery list and recipe manager Self-hosted grocery list and recipe manager.Dev Tools -
Kometa: Python script to update metadata information for items in Plex as well as automatically build collections and playlists Python script to update metadata information for items in Plex as well as automatically build collections and playlists.Media -
Komga: Media server for comics, manga, magazines, and books with API and OPDS support Media server for comics, manga, magazines, and books with API and OPDS support.MediaDev Tools -
Komodo: Multi-Server Docker and Build Management A self-hosted control plane for managing containers, Compose stacks, builds, and git-driven deployments across multiple servers from one dashboard.FilesMonitoringDev Tools -
Kopia: Encrypted, Deduplicated Backups With a GUI and a Repository Server A fast, open source backup tool with client-side encryption, deduplication, compression, snapshot policies, a desktop GUI, and support for S3, B2, Azure, GCS, SFTP, WebDAV, and rclone backends.FilesDev Tools -
KrakenD: Extensible, high performance API gateway for adopting microservices and secure communications Extensible, high performance API gateway for adopting microservices and secure communications.Dev Tools -
Ktistec: Single-User ActivityPub Server A self-contained single-user ActivityPub server for participating in the fediverse from your own domain, with no external dependencies beyond a database.Dev Tools -
LANCommander: Open-source digital video game distribution Open-source digital video game distribution platform.MediaDev Tools -
Langflow: Visual Flow Building With a Python Escape Hatch A low-code visual editor for language model pipelines where every node is a Python component you can edit, bridging the gap between drag-and-drop and writing code.Dev Tools -
Langfuse: Observability for LLM Applications Tracing, evaluation and prompt management for applications built on language models, recording the full chain of calls so you can see cost, latency and what the model actually received.Dev ToolsFinance -
LazyLibrarian: Application for following authors and grabbing Application for following authors and grabbing metadata for electronic libraries.Security -
Leantime: Goals-focused project management system for non-project managers Goals-focused project management system for non-project managers.Productivity -
Leed: Free and minimal RSS aggregator Free and minimal RSS aggregator. -
Lemmy: Link aggregator and forum for the Fediverse Link aggregator and forum for the Fediverse. -
Lens for Plausible: iOS Client for Plausible Analytics An iOS companion app that displays Plausible Analytics dashboards natively on iPhone and iPad, connecting to self-hosted or cloud Plausible instances.FilesMonitoring -
LibreChat: One Chat Interface for Every Model A ChatGPT-style web interface that talks to OpenAI, Anthropic, Google, and local models through Ollama, with multi-user accounts, conversation search, and per-user API budgets.Dev ToolsCommunicationFinance -
LibreNMS: Network Monitoring With SNMP Auto-Discovery A community-driven network monitoring system that discovers switches, routers, firewalls, and servers over SNMP, graphs traffic and health, alerts on problems, and supports a huge range of vendors.FilesSecurityMonitoring -
LibrePhotos: Self-hosted open-source photo management service Self-hosted open-source photo management service.Media -
LibreTranslate: A Self-Hosted Machine Translation API An open source translation API and web interface powered by Argos Translate models that runs fully offline, with file translation, API keys, and optional GPU acceleration.FilesDev Tools -
Librum: Application designed to make reading enjoyable and straightforward for everyone Application designed to make reading enjoyable and straightforward for everyone.Productivity -
Lidarr: Music collection and download manager Music collection and download manager.Media -
Lidify: Web interface for finding similar artists based on Lidarr metadata Web interface for finding similar artists based on Lidarr metadata. -
Lightweight Music Server: Music streaming software with a web interface Music streaming software with a web interface.Media -
LimeSurvey: Open-source survey software with advanced features Open-source survey software with advanced features. -
LinguaCafe: Self-hosted software that helps language learners Self-hosted software that helps language learners acquire vocabulary through reading.Productivity -
LinkAce: Self-hosted archive for collecting links to your favorite websites and pages Self-hosted archive for collecting links to your favorite websites and pages. -
Linkding Extension: Browser Extension for Linkding A browser extension for saving pages to a self-hosted Linkding instance in one click, with tag autocomplete and duplicate detection. -
Linkding Injector: Injects search results from Linkding into search Injects search results from Linkding into search pages. -
Linkding: Fast, Minimal Bookmark Manager A simple self-hosted bookmark manager with tagging, full-text search, archived snapshots, and an unusually healthy ecosystem of third-party clients.MediaProductivity -
Linkdy: Linkding client for managing bookmarks from mobile or desktop devices Linkding client for managing bookmarks from mobile or desktop devices.MediaProductivity -
Linklater: Android Client for Linkding An unofficial Android client for Linkding that adds share-sheet saving and offline browsing of your self-hosted bookmark collection.MediaFilesDev ToolsProductivity -
LinkStack: The ultimate solution for creating a personalized and professional profile page and link aggregator The ultimate solution for creating a personalized and professional profile page and link aggregator.Files -
LinkThing: iOS Client for Linkding An iOS client for Linkding with share-sheet integration, tag support, and search across a self-hosted bookmark collection.MediaFilesProductivity -
Linkwarden: Self-hosted collaborative bookmark manager for collecting, organizing, and preserving webpages and articles Self-hosted collaborative bookmark manager for collecting, organizing, and preserving webpages and articles.MediaProductivity -
listmonk: Standalone, self-hosted, newsletter and mailing Standalone, self-hosted, newsletter and mailing list manager.Communication -
LiteLLM: One API in Front of Many Model Providers A proxy presenting an OpenAI-compatible API in front of a hundred model providers and local runtimes, with routing, fallback, rate limits and per-key spend tracking.SecurityDev Tools -
llama.cpp: The Inference Engine Under Most Local AI A C++ implementation of language model inference that runs on CPUs, consumer GPUs, and Apple Silicon, and quietly powers a large share of the local AI ecosystem.Files -
lldap: Lightweight LDAP implementation Lightweight LDAP implementation.Security -
LobeChat: A Polished Chat Interface With a Plugin Ecosystem A modern chat front-end supporting many model providers, with a plugin marketplace, custom assistants, voice input, and multimodal support, deployable as a container or to the edge.Dev ToolsCommunication -
LocalAI: A Drop-In OpenAI API for Your Own Hardware A local inference server that implements the OpenAI API specification, so existing applications point at it with a URL change and get chat, embeddings, audio, and image generation locally.MediaDev ToolsCommunication -
Lodestone: Open-source hosting tool for Minecraft and other Open-source hosting tool for Minecraft and other multiplayer games.Media -
Logdy: Web-based real-time log viewer Web-based real-time log viewer.Monitoring -
Logseq: Privacy-first, open-source platform for knowledge management and collaboration Privacy-first, open-source platform for knowledge management and collaboration.MonitoringProductivity -
Logto: Identity infrastructure for developers Identity infrastructure for developers.SecurityMonitoring -
Loki: Horizontally-scalable, highly-available, multi-tenant log aggregation system Horizontally-scalable, highly-available, multi-tenant log aggregation system.Monitoring -
LubeLogger: Web-based vehicle maintenance and fuel mileage Web-based vehicle maintenance and fuel mileage tracker.Monitoring -
LunaSea: Software controller focused on providing a seamless experience between media software Software controller focused on providing a seamless experience between media software.MediaFiles -
Lychee: Easy-to-use photo management system for managing Easy-to-use photo management system for managing and sharing photos.Media -
Lynis: Auditing a Linux System's Hardening A shell-based security auditing tool that inspects a running system against hundreds of checks and produces a prioritised list of specific hardening suggestions.Dev Tools -
Lyrion Music Server: The Community Continuation of Logitech Media Server The streaming server behind Squeezebox players, formerly SlimServer, SqueezeCenter, and Logitech Media Server, now community maintained as Lyrion. Streams your library and internet radio to Squeezebox hardware and software players.MediaMonitoringDev Tools -
Maddy: A Complete Mail Server in One Binary A single Go binary providing SMTP, IMAP, DKIM signing, spam filtering hooks and user management, replacing the traditional stack of Postfix, Dovecot, OpenDKIM and a database.Dev ToolsCommunication -
MagicPack: Web-based Wake-On-LAN tool for teams or companies Web-based Wake-On-LAN tool for teams or companies.Communication -
Mail-in-a-Box: Become your own mail service provider in a few easy steps Mail-in-a-Box lets you become your own mail service provider in a few easy steps.Communication -
Mailcow: Mailserver suite with the 'moo' The mailserver suite with the 'moo'.Communication -
Mailu: simple yet full-featured mail server as a set of Docker images A simple yet full-featured mail server as a set of Docker images.Dev ToolsCommunication -
Maintainerr: Monitor and remove unwatched Plex media Monitor and remove unwatched Plex media.MediaMonitoring -
Maker Management Platform: Digital asset manger for 3D printing, manufacturing, laser engraving, and more Digital asset manger for 3D printing, manufacturing, laser engraving, and more.Dev Tools -
Manage My Damn Life: self-hosted frontend for managing your CalDAV tasks and calendars A self-hosted frontend for managing your CalDAV tasks and calendars.CommunicationProductivity -
managebot: View and manage Docker containers from Discord View and manage Docker containers from Discord.Dev ToolsCommunication -
Manet: Stream your music library from Jellyfin to your iOS devices with ease, for free Stream your music library from Jellyfin to your iOS devices with ease, for free.Media -
Mantium: Manga tracking dashboard from multiple sources Manga tracking dashboard from multiple sources.Monitoring -
Manyfold: Self-hosted digital asset manager for 3D print Self-hosted digital asset manager for 3D print files.FilesDev Tools -
MariaDB: The Community MySQL Fork A fork of MySQL created when Oracle acquired it, now the default relational database in most Linux distributions and the backend for a large share of self-hosted applications.Files -
Mastodon: Social network server where users can follow Social network server where users can follow friends and discover new ones.Dev Tools -
Matomo: powerful web analytics platform that gives you 100% data ownership A powerful web analytics platform that gives you 100% data ownership.Monitoring -
Mattermost: Open source platform for secure collaboration An open source platform for secure collaboration across the entire software development lifecycle. -
Mautic: Open-source marketing automation software Open-source marketing automation software.Home Auto -
Maybe: Fully transparent, open-source, community-backed A fully transparent, open-source, community-backed personal finance app.Finance -
Mealie: Self-Hosted Recipe Manager and Meal Planner A recipe manager that imports recipes from any URL by scraping structured data, plans meals on a calendar, and generates shopping lists automatically.Dev ToolsCommunication -
Mealient: Android client for Mealie Android client for Mealie. -
Medama: Lightweight and privacy-focused web analytics Lightweight and privacy-focused web analytics.Monitoring -
MediaCMS: modern, fully featured open source video and media CMS A modern, fully featured open source video and media CMS.Media -
Medialytics: Basic, free tool that shows information about Plex A basic, free tool that shows information about Plex content.Media -
Medusa: Automatic video library manager for TV shows Automatic video library manager for TV shows.Media -
Medusa: set of commerce modules and tools that allow you to build rich, reliable, and performant commerce applications A set of commerce modules and tools that allow you to build rich, reliable, and performant commerce applications. -
Meetable: Minimal Self-Hosted Events Aggregator A lightweight self-hosted events site that collects and displays community events, built for groups that want a public calendar without a commercial platform.Dev ToolsCommunication -
Meilisearch: Fast, Typo-Tolerant Search Engine A lightning-fast, typo-tolerant search engine you can drop into any app, with results in milliseconds. -
Memories: Fast, modern, and advanced photo management Nextcloud app Fast, modern, and advanced photo management Nextcloud app.MediaFiles -
memos: open-source, lightweight note-taking service An open-source, lightweight note-taking service.Productivity -
Mergeable: Better inbox for GitHub pull requests Better inbox for GitHub pull requests.Dev Tools -
MeshCentral: complete web-based remote monitoring and management web site A complete web-based remote monitoring and management web site.Monitoring -
Metabase: Fast analytics with the friendly UX and integrated Fast analytics with the friendly UX and integrated tooling to let your company explore data on their own.Monitoring -
MeTube: Web UI for YouTube-DL Web UI for YouTube-DL. -
MicroBin: Secure, configurable file-sharing and URL A secure, configurable file-sharing and URL shortening web app.Files -
Mihon: Full-featured reader for manga, webtoons, comics, and more Full-featured reader for manga, webtoons, comics, and more.Productivity -
Milvus: Vector Search Built for Scale A distributed vector database separating storage from compute, designed for billions of vectors, with a lightweight embedded mode for development and small deployments.FilesDev Tools -
Mimir: Horizontally Scalable Prometheus Storage A Grafana Labs project providing long-term, multi-tenant metrics storage that speaks the Prometheus API, designed as a single scalable service rather than components bolted beside existing servers.FilesMonitoringDev ToolsProductivity -
Miniboard: Lightweight Dashboard With Uptime Monitoring A compact self-hosted dashboard combining service links with tabs, uptime checks, and notifications in a single lightweight application.Monitoring -
Miniflux: Minimalist RSS Reader A deliberately minimal, single-binary RSS reader written in Go, focused on fast reading with no JavaScript, no clutter, and very low resource use.Productivity -
Minio: High performance object storage High performance object storage.Files -
MinusPod: Remove Ads From Podcasts With Whisper and an LLM A self-hosted server that transcribes podcast episodes with Whisper, uses an LLM to find ad segments, cuts them with FFmpeg, and serves you an ad-free RSS feed.Media -
MiroTalk: Simple, secure, and fast real-time video conferences Simple, secure, and fast real-time video conferences.Media -
Misskey: Open-source, federated social media platform that's free forever Misskey is an open-source, federated social media platform that's free forever.MediaDev Tools -
Mixpost: Easily create, schedule, publish, and manage social media content in one place Easily create, schedule, publish, and manage social media content in one place.MediaDev Tools -
Moe Memos: Companion note-taking application for Memos Companion note-taking application for Memos.Productivity -
MongoDB: Document Database With a Licence Caveat The document database that popularised storing JSON-like records without a fixed schema, now under the SSPL, which is not an open source licence and matters if you intend to offer it as a service.Productivity -
Monica: Open-source personal relationship management system Open-source personal relationship management system. -
Mosquitto: Open-source implementation of the MQTT protocol Open-source implementation of the MQTT protocol.Home Auto -
Mox: A Modern, Low-Maintenance Mail Server in a Single Go Binary An all-in-one mail server with SMTP, IMAP, webmail, junk filtering, and automatic SPF, DKIM, DMARC, MTA-STS, DANE, and ACME certificates, set up with one quickstart command. MIT and MPL-2.0.SecurityCommunication -
Mumble: Open-source, low-latency, high quality voice chat Open-source, low-latency, high quality voice chat software.Communication -
Munin: Simple Node Graphing With Minimal Setup A monitoring tool with a deliberately simple plugin model and automatic graph generation, aimed at a handful of servers where the setup cost of a full metrics stack is not worth paying.Monitoring -
Music Assistant: Media library manager connecting streaming services to a wide range of connected speakers Media library manager connecting streaming services to a wide range of connected speakers.Media -
MyHeats: Self-Hosted Live Leaderboard and Scoring A self-hosted live leaderboard for running scored competitions and events, displaying results in real time on a shared screen.Files -
Mylar3: Automated comic book downloader program Automated comic book downloader program.Media -
MySpeed: Self-Hosted Internet Speed Test Tracker A self-hosted speed test analysis tool that runs scheduled tests against your connection and charts the results over time. -
MySQL: World's most popular open-source database The world's most popular open-source database. -
n8n: Workflow Automation With a Visual Editor A node-based workflow automation platform connecting hundreds of services with conditional logic, scheduling, and custom code steps, self-hostable in full.MonitoringHome AutoDev Tools -
Nagios Core: The Original Check-Based Monitoring System The monitoring system that defined the plugin and exit-code model, still deployed widely and still the reason a vast library of check scripts exists.MonitoringDev Tools -
Nautical Backup: Simple Docker volume backup tool Simple Docker volume backup tool.FilesDev Tools -
Navidrome: Lightweight Music Streaming Server A modern Subsonic-compatible music server written in Go, indexing your collection and streaming it to a wide ecosystem of clients on very modest hardware.Media -
Nebula: A Scalable Overlay Network From Slack A peer-to-peer overlay network using certificates rather than pre-shared keys, with host-level firewall rules carried in the certificate itself. Built at Slack for connecting large fleets.FilesSecurityCommunication -
Neko: Self-hosted virtual browser Self-hosted virtual browser. -
NetAlertX: Scans for devices connected to your network and alerts you if new and unknown devices are found Scans for devices connected to your network and alerts you if new and unknown devices are found.Monitoring -
NetBird: Combines a configuration-free peer-to-peer private network and a centralized access control system into a single platform Combines a configuration-free peer-to-peer private network and a centralized access control system into a single platform. -
NetBox: Network Source of Truth for IPAM and DCIM The standard open-source source of truth for network infrastructure, modeling IP addresses, VLANs, racks, devices, circuits, and cabling for documentation and automation.Home AutoDev ToolsProductivity -
Netdata: Real-Time System Monitoring A monitoring agent that collects thousands of per-second metrics automatically and visualizes them immediately, with essentially zero configuration.MediaMonitoring -
Newsblur: Personal news reader that brings people together Personal news reader that brings people together to talk about the world.Productivity -
Nextcloud News: RSS/Atom feed reader RSS/Atom feed reader.FilesProductivity -
Nextcloud Tables: Create your own tables and columns from scratch or pre-defined templates Create your own tables and columns from scratch or pre-defined templates.Files -
Nextcloud: Self-Hosted File Sync and Collaboration A full content collaboration platform providing file sync, sharing, calendars, contacts, and an app ecosystem covering office documents, chat, and email.FilesCommunicationProductivity -
nextExplorer: A Modern Web File Manager With SSO and Sharing A self-hosted, browser-based file explorer with multiple users, OIDC single sign-on, previews, a built-in code editor, link sharing, and ripgrep-powered search.FilesSecurityDev Tools -
Nexus Repository: An Artifact Repository for Many Formats A repository manager hosting and proxying Maven, npm, Docker, PyPI, NuGet, APT and other package formats, used as a caching layer and a private registry for build artifacts.SecurityDev Tools -
nforwardauth: Simple and minimalist forward auth service intended for use with reverse proxies Simple and minimalist forward auth service intended for use with reverse proxies.Security -
Nginx Proxy Manager: Reverse Proxy With a Web UI A web interface over nginx that handles reverse proxy hosts, automatic Let's Encrypt certificates, and access control without editing configuration files.FilesSecurity -
NocoDB: Turn any SQL-based database into a smart spreadsheet Turn any SQL-based database into a smart spreadsheet.Home AutoProductivity -
Node-RED: Low-code programming for event-driven applications Low-code programming for event-driven applications.FilesDev Tools -
NodeBB: Real-Time Forum Software Built on Node.js Modern community forum software with real-time discussions, notifications, plugins, themes, SSO, and a REST API, running on Node.js with Redis, MongoDB, or PostgreSQL. GPL-3.0.SecurityDev Tools -
Note Mark: Lightning fast and minimal web-based Markdown Lightning fast and minimal web-based Markdown notes app.Productivity -
Notesnook: End-to-End Encrypted Notes With a Self-Hostable Sync Server A zero-knowledge encrypted note application with clients for every platform and a self-hostable sync server, so the notes are encrypted before they leave the device.FilesProductivity -
Notifuse: Self-Hosted Newsletters, Email Marketing, and Transactional Email An email platform with a visual MJML editor, campaigns with A/B testing, automation journeys, a transactional email API, and support for SES, Mailgun, Postmark, and more. Moved to the BSL license in version 40.Home AutoDev ToolsCommunication -
ntfy: Simple HTTP-based pub-sub notification service Simple HTTP-based pub-sub notification service. -
nzb360: Android Manager for Usenet, Torrents, and the *arr Stack A long-running Android application that manages Usenet and torrent clients alongside Sonarr, Radarr, and the rest of the *arr suite from one interface. -
NZBGet: Efficient Usenet Downloader A lightweight, high-performance Usenet downloader built to run comfortably on modest hardware.Dev Tools -
Observium: Autodiscovering SNMP Network Monitoring A network monitoring platform built around SNMP autodiscovery, producing interface graphs and device inventory for switches, routers and servers with very little configuration.MonitoringDev Tools -
Obsidian LiveSync: Community-implemented sync plugin for Obsidian Community-implemented sync plugin for Obsidian.FilesProductivity -
Obtainium: Install and update apps directly from their Install and update apps directly from their release pages and receive notifications when updates are available. -
OctoPrint: Snappy web interface for your 3D printer Snappy web interface for your 3D printer. -
Odoo: Open-Source ERP and Business Suite A modular business application suite covering CRM, accounting, inventory, sales, HR, manufacturing, and e-commerce, with a community edition you can self-host.Finance -
OhMyForm: Free, open-source forms survey Free, open-source forms survey. -
OliveTin: Safe and simple access to pre-defined shell Safe and simple access to pre-defined shell commands from a web interface. -
Ollama: Run Language Models Locally A tool for running large language models on your own hardware with a single command, exposing an API compatible with many front-ends.Dev Tools -
Ombi: Friendly media request tool with media server sync support Friendly media request tool with media server sync support.MediaFiles -
Omnivore: Complete, open-source read-it-later solution for people who like reading Complete, open-source read-it-later solution for people who like reading.Productivity -
OneDev: Git server with CI/CD, kanban, and packages Git server with CI/CD, kanban, and packages.Dev ToolsProductivity -
OneUptime: Complete open-source observability platform Complete open-source observability platform.Monitoring -
ONLYOFFICE Docs: Self-Hosted Online Editors With Strong Microsoft Office Compatibility Collaborative online editors for documents, spreadsheets, presentations, forms, and PDFs built around the DOCX, XLSX, and PPTX formats, integrating with Nextcloud, Seafile, ownCloud, and more. AGPL-3.0, free Community Edition.FilesProductivity -
Onyx: Search and Chat Across Your Team's Tools Formerly Danswer, an open-source enterprise search platform that connects to Slack, Confluence, Google Drive, GitHub, and dozens of others, then answers questions with citations.FilesDev ToolsCommunication -
Open Streaming Platform: Self-hosted video streaming and recording server Self-hosted video streaming and recording server.Media -
Open Web Analytics: Open-source alternative to commercial web analytics tools like Google Analytics Open-source alternative to commercial web analytics tools like Google Analytics.MonitoringDev Tools -
Open WebUI: Self-Hosted AI Chat Interface A polished, self-hosted chat interface for Ollama and OpenAI-compatible APIs, with multi-user support and RAG built in.Dev ToolsCommunication -
OpenBao: Secrets Management, Openly Governed A community fork of HashiCorp Vault under the Linux Foundation, providing encrypted secret storage, dynamic credentials, and encryption as a service with an unchanged Mozilla Public License.FilesSecurity -
OpenBudgeteer: Budgeting app based on the bucket budgeting Budgeting app based on the bucket budgeting principle.Dev ToolsFinance -
OpenCloud: File Sync and Sharing Without a Database An Apache-licensed file sync and collaboration platform written in Go that stores everything on the filesystem instead of a database, authenticates through OpenID Connect, and integrates with web office suites.FilesSecurity -
OpenEMR: Open-source electronic health records Open-source electronic health records. -
openHAB: Vendor-Neutral Home Automation on the JVM A home automation platform with bindings for hundreds of protocols and devices, a text-based rule language alongside a visual editor, and a design that keeps local control rather than depending on a cloud.FilesHome Auto -
OpenLDAP: The Reference LDAP Directory Server The long-standing open source implementation of the Lightweight Directory Access Protocol, providing a hierarchical directory for users, groups and arbitrary organisational data.Security -
OpenObserve: Logs, Metrics, and Traces in a Single Binary With Cheap Storage An observability platform for logs, metrics, traces, and real user monitoring that stores data as compressed Parquet on local disk or S3, queried with SQL and PromQL. A lightweight alternative to Elasticsearch and Datadog. AGPL-3.0.FilesMonitoring -
OpenProject: Self-Hosted Project Management With Gantt Charts and Agile Boards A full project management platform with Gantt scheduling, Kanban and Scrum boards, time and cost tracking, wikis, and GitHub, GitLab, and Nextcloud integrations. GPL-3.0 Community Edition, positioned as a Jira alternative.FilesDev ToolsProductivity -
Openreads: Privacy-oriented and cross-platform book tracking app Privacy-oriented and cross-platform book tracking app.MediaProductivity -
OpenSearch: The Open Fork of Elasticsearch A search and analytics engine forked from Elasticsearch 7.10 when Elastic changed licence, maintained under the Apache 2.0 licence with its own dashboards, alerting and vector search.Monitoring -
OpenSign: Document e-signing solution The open-source document e-signing solution.Productivity -
OpenTalk: Secure video conferencing solution designed with productivity, digital sovereignty, and privacy in mind Secure video conferencing solution designed with productivity, digital sovereignty, and privacy in mind.MediaDev Tools -
OPNsense: Open-source, FreeBSD-based firewall and routing Open-source, FreeBSD-based firewall and routing software.Security -
Organizr: Homelab services organizer and dashboard Homelab services organizer and dashboard.MonitoringHome Auto -
Ory Kratos: Headless Identity and User Management An API-first identity server handling registration, login, account recovery and multi-factor without providing any user interface, intended to be driven by your own frontend.FilesSecurityMonitoringDev ToolsFinance -
Outline: Modern team knowledge base for your internal documentation, product specs, support answers, meeting notes, onboarding, and more Modern team knowledge base for your internal documentation, product specs, support answers, meeting notes, onboarding, and more.CommunicationProductivity -
Overleaf: Web-based collaborative LaTeX editor Web-based collaborative LaTeX editor. -
Overseerr: Request Management for Plex Libraries A polished request and discovery interface for Plex users, integrating with Sonarr and Radarr to fulfil approved requests automatically.Media -
Owncast: What You Need to Know: Take control over your content and stream it Take control over your content and stream it yourself.Media -
ownCloud Infinite Scale: Enterprise file sync and share data platform Enterprise file sync and share data platform.Files -
ownCloud: Free and open-source software project for content Free and open-source software project for content collaboration and sharing and syncing of files.FilesDev ToolsProductivity -
Oxker: Simple interface for managing and controlling A simple interface for managing and controlling Docker containers from the terminal.Dev Tools -
PairDrop: Local file sharing in your browser inspired by Apple's AirDrop Local file sharing in your browser inspired by Apple's AirDrop.Files -
Pangolin: Identity-Aware Tunneled Reverse Proxy A self-hosted, identity-aware tunneled reverse proxy built on WireGuard, for securely exposing private services without opening ports.Security -
Panora: API endpoints for a catalogue of integrations for SaaS software API endpoints for a catalogue of integrations for SaaS software.MonitoringDev Tools -
Paperless Mobile: (almost) fully fledged mobile paperless client An (almost) fully fledged mobile paperless client. -
Paperless-AI: LLM Tagging and Document Chat for Paperless-ngx An add-on for Paperless-ngx that uses OpenAI, Ollama, and other LLMs to assign titles, tags, document types, and correspondents automatically, and lets you search documents by chatting with them. MIT; currently unmaintained.CommunicationProductivity -
paperless-gpt: LLM-Powered OCR and Tagging for Paperless-ngx A companion for Paperless-ngx that uses vision LLMs for better OCR on poor scans and generates titles, tags, and correspondents, with a review screen before changes are applied. Supports Ollama, OpenAI, Anthropic, Mistral, and Gemini. MIT. -
Paperless-ngx: Document Management and OCR Archive A document management system that OCRs scanned paperwork, tags and files it automatically, and makes years of documents searchable by their contents.FilesProductivity -
Papermark: Open-source document sharing with built-in analytics and custom domains Open-source document sharing with built-in analytics and custom domains.MonitoringProductivity -
Papermerge: Open-source document management system for digital Open-source document management system for digital archives and scanned documents.Dev ToolsProductivity -
Paperparrot: Mobile Client for Paperless-ngx A mobile client for Paperless-ngx that browses, searches, and uploads documents to a self-hosted document archive from a phone.Productivity -
Papra: Minimal Document Archiving With OCR, Tags, and Email Import A lightweight document management platform with OCR, full-text search, rule-based tagging, email ingestion, organizations, and expiring share links, as a simpler alternative to Paperless-ngx.FilesCommunicationProductivity -
Parseable: Log analytics system for high throughput log ingestion Log analytics system for high throughput log ingestion.Monitoring -
Passbolt: Open-source password manager for teams Open-source password manager for teams.SecurityCommunication -
Password Pusher: Application for securely communicating passwords Application for securely communicating passwords over the web.Security -
Payload: Headless CMS and application framework Headless CMS and application framework. -
PdfDing: Minimal PDF manager and viewer Minimal PDF manager and viewer. -
PeaNUT: Tiny dashboard for network UPS tools Tiny dashboard for network UPS tools.Monitoring -
PeerTube: ActivityPub-federated video streaming platform using P2P directly in your web browser ActivityPub-federated video streaming platform using P2P directly in your web browser.Media -
Pelican Panel: Game server control panel Game server control panel. -
Penpot: Open-source design and prototyping platform Open-source design and prototyping platform. -
Peppermint: Open-source ticket management and help desk Open-source ticket management and help desk solution. -
Pepperminty Wiki: Complete wiki engine contained in a single file Complete wiki engine contained in a single file.FilesProductivity -
Perplexica: A Self-Hosted AI Search Engine Combines a language model with live web search to answer questions with cited sources, running entirely on your own infrastructure using SearXNG and a local model.MediaDev Tools -
Petio: Request, review, and discover companion app for Plex Request, review, and discover companion app for Plex.Media -
pfSense: FreeBSD-Based Firewall and Router A mature open-source firewall and router distribution built on FreeBSD and pf, providing enterprise routing, VPN, and traffic filtering from a web interface.Security -
PG Back Web: Effortless PostgreSQL backups with a user-friendly Effortless PostgreSQL backups with a user-friendly web interface.Files -
Photofield: Experimental fast photo viewer Experimental fast photo viewer.Media -
PhotoPrism: AI-Powered Photo Library Manager A self-hosted photo library with local machine learning for tagging, face recognition, and search, designed to run reliably on modest hardware.Media -
Photoview: Photo gallery for self-hosted personal servers Photo gallery for self-hosted personal servers.Media -
phpIPAM: Open Source IP Address Management A web-based IPAM for tracking subnets, IP addresses, VLANs, and VRFs, with network scanning, a REST API, and PowerDNS integration. Replaces the spreadsheet of IP addresses. GPL-3.0.Dev ToolsProductivity -
Pi-hole Remote: Pi-hole Management for Apple Devices An iOS, iPadOS, and macOS client for managing Pi-hole instances, with quick disable, query log access, and statistics.Monitoring -
Pi-hole: Network-Wide DNS Ad Blocking A DNS sinkhole that blocks ads and trackers for every device on your network, including phones, smart TVs, and appliances that cannot run browser extensions.Home Auto -
Picsur: Easy-to-use, self-hostable image sharing service with built in converting Easy-to-use, self-hostable image sharing service with built in converting. -
PiGallery2: fast directory-first photo gallery website, with rich UI, optimized for running on low resource servers A fast directory-first photo gallery website, with rich UI, optimized for running on low resource servers.Media -
Piglet: Simple web app for managing household budgets Simple web app for managing household budgets.Finance -
Pinchflat: YouTube media downloads and management YouTube media downloads and management.Media -
Pingvin Share: File sharing platform combining lightness and beauty File sharing platform combining lightness and beauty.Files -
Pinry: Tiling image board system for people who want to save, tag, and share images, videos, and webpages Tiling image board system for people who want to save, tag, and share images, videos, and webpages.MediaFiles -
Piped: A Privacy-Friendly YouTube Front End An open source YouTube front end with no ads, no tracking, and no Google account, with SponsorBlock, Return YouTube Dislike, subscriptions, and playlists. Self-hostable, with public instances.Finance -
Piper: Fast Local Text to Speech A neural text-to-speech system optimised to run on modest hardware including a Raspberry Pi, with natural-sounding voices in many languages and no network dependency. -
Piwigo: Full-featured open source photo gallery Full-featured open source photo gallery application for the web.Media -
Pixelfed: Free and ethical photo sharing platform, powered Free and ethical photo sharing platform, powered by ActivityPub federation.Media -
Plane: Open source project management for tracking issues, managing tasks, and product roadmaps Open source project management for tracking issues, managing tasks, and product roadmaps.Productivity -
Planka: A Self-Hosted Trello-Style Kanban Board A real-time collaborative kanban board with Markdown cards, notifications through 100+ providers, and a REST API. The free Community Edition uses a fair-code license, and SSO moved to the paid Pro edition in 2026.SecurityDev ToolsProductivity -
Plappa: Audiobook Player for Jellyfin, Emby, and Audiobookshelf An iOS audiobook player that connects to Jellyfin, Emby, or Audiobookshelf servers, with chapter support, sleep timers, and cross-device progress sync.MediaFiles -
Plausible: Simple, open-source, lightweight, and privacy-friendly web analytics Simple, open-source, lightweight, and privacy-friendly web analytics.Monitoring -
play:Sub: Subsonic-Compatible Music Streamer for iOS A long-standing iOS client for Subsonic-compatible music servers, including Navidrome, Airsonic, and Ampache, with offline caching and gapless playback.Media -
Pleroma: Microblogging server that can federate with other Microblogging server that can federate with other servers that support ActivityPub.Monitoring -
Plex Dash: Multi-Server Plex Activity Dashboard A mobile dashboard showing active playback across multiple Plex servers in one view. Requires a Plex Pass subscription.MediaMonitoring -
Plex Prerolls: Script for automating and managing Plex pre-rolls Script for automating and managing Plex pre-rolls.Media -
Plex Rewind: Present Plex user statistics and habits in a beautiful and organized manner Present Plex user statistics and habits in a beautiful and organized manner.MediaMonitoring -
Plex: Polished Media Server With a Commercial Tier A mature media server with the most refined client apps in the category, streaming your library to virtually any device, with some features behind a Plex Pass subscription.MediaDev Tools -
Plexamp: Plex's Dedicated Music Player A polished music player built by Plex specifically for music libraries, with gapless playback, offline sync, and playlist tooling well beyond the standard Plex clients.MediaFilesDev Tools -
PlexGifMaker: What You Need to Know: Generate GIFs using a Plex library and subtitles Generate GIFs using a Plex library and subtitles.Media -
Pocket ID: Passkey-Only Single Sign-On for Your Self-Hosted Apps A simple, OpenID Connect certified identity provider that authenticates users with passkeys only, no passwords. A lightweight alternative to Keycloak and Authentik for homelabs and small teams.SecurityHome AutoCommunication -
PocketBase: Open-Source Backend in One File An open-source backend in a single executable: SQLite database, realtime subscriptions, auth, file storage, and an admin UI included.FilesSecurity -
PodFetch: Self-Hosted Podcast Manager and Downloader A self-hosted podcast manager that subscribes to feeds, downloads episodes to your own storage, and serves them through a web player or mobile client.MediaFiles -
Podgrab: Self-hosted podcast manager/downloader/archiver Self-hosted podcast manager/downloader/archiver tool to download podcast episodes with an integrated player.Media -
Podsync: Turn Youtube and Vimeo channels, users, and playlists into podcast feeds Turn Youtube and Vimeo channels, users, and playlists into podcast feeds.MediaFiles -
Portainer: Container Management Web Interface A web interface for managing Docker, Docker Swarm, and Kubernetes environments, covering containers, images, volumes, networks, and stacks.Dev Tools -
Postal: fully featured open source mail delivery platform for incoming and outgoing e-mail A fully featured open source mail delivery platform for incoming and outgoing e-mail.Communication -
Postfix: The Default Mail Transfer Agent The SMTP server on most Linux systems, used both as a full mail server and, far more commonly, as a send-only relay so local software can deliver mail.Communication -
PostgreSQL: Advanced object-relational database management system that supports an extended subset of the SQL standard Advanced object-relational database management system that supports an extended subset of the SQL standard. -
PostHog: Open-source product analytics, session recording, feature flagging, and A/B testing Open-source product analytics, session recording, feature flagging, and A/B testing.Monitoring -
PowerDNS: Authoritative DNS With a Database Backend An authoritative nameserver that stores zones in SQL, LDAP or flat files rather than zone text, with a REST API and a separate recursive resolver for the other half of the DNS problem.FilesSecurityDev Tools -
PrivateBin: Minimalist, open-source online pastebin where the server has zero knowledge of pasted data Minimalist, open-source online pastebin where the server has zero knowledge of pasted data.Productivity -
Priviblur: What You Need to Know: Privacy-focused alternative frontend to Tumblr Privacy-focused alternative frontend to Tumblr. -
Profilarr: Import, export, and sync profiles and custom formats via Radarr and Sonarr API Import, export, and sync profiles and custom formats via Radarr and Sonarr API.FilesDev Tools -
ProjectSend: Free, open-source software that lets you share Free, open-source software that lets you share files with your clients, focused on ease of use and privacy.FilesProductivity -
Prologue: Audiobook Player for Plex An iOS audiobook player that treats a Plex library as an audiobook source, adding chapter navigation, sleep timers, and playback speed control.MediaMonitoring -
Prometheus: Metrics Collection and Time-Series Database A monitoring system that scrapes metrics from instrumented targets on an interval, stores them as time series, and evaluates alerting rules with a powerful query language.Monitoring -
Prosody: A Light, Extensible XMPP Server A Lua XMPP server valued for a readable configuration file, low resource use and a module system simple enough that writing an extension is genuinely approachable.FilesProductivity -
Prowlarr: Indexer Manager for the *arr Stack A central indexer manager that configures torrent trackers and Usenet indexers once and syncs them automatically to Sonarr, Radarr, Lidarr, and Readarr.FilesProductivity -
Proxmobo: Mobile Client for Proxmox VE A mobile application for monitoring and managing Proxmox VE, covering virtual machine and container control, node status, and resource usage.Monitoring -
Pterodactyl: Open-source game server management panel Open-source game server management panel. -
Puter: Advanced open-source desktop environment in the browser Advanced open-source desktop environment in the browser. -
Pwgen: Self-Hosted Password Generator A self-hosted password generator with configurable length, character sets, and passphrase options, generating credentials in the browser.Security -
pyLoad: Free and open-source download manager Free and open-source download manager. -
qBitController: Control qBittorrent from your Android device Control qBittorrent from your Android device. -
qBittorrent: Open Source BitTorrent Client A full-featured, ad-free BitTorrent client with a web interface, well suited to headless servers and integration with the *arr automation stack.Home Auto -
Qdrant: A Vector Database for Embeddings A Rust vector search engine with payload filtering, built for storing embeddings and retrieving nearest neighbours, which is the retrieval half of a retrieval-augmented generation system. -
qui: A Fast, Modern Web UI for Multiple qBittorrent Instances A lightweight Go web interface from the autobrr team that manages several qBittorrent instances from one place, with cross-seeding, rule-based automation, and scheduled backups.FilesHome AutoCommunication -
Quickwit: Cloud-native search engine for observability Cloud-native search engine for observability.Files -
RadaRec: Web GUI for finding similar movies to selected Web GUI for finding similar movies to selected Radarr movies.Media -
Radarr: Automated Film Collection Management A film-focused fork of Sonarr that monitors wanted movies, grabs releases matching your quality rules, and organizes them into your media library.MediaMonitoring -
Radicale: Simple CalDAV and CardDAV server Simple CalDAV and CardDAV server. -
RAGFlow: Retrieval Built Around Document Understanding A RAG engine that puts unusual effort into parsing documents correctly, handling tables, layout, and scanned pages, on the argument that retrieval quality starts with extraction quality.Productivity -
Rallly: Event polls for scheduling and organizing events Event polls for scheduling and organizing events. -
Rclone: Command-line program for syncing files and directories to and from different cloud storage providers Command-line program for syncing files and directories to and from different cloud storage providers.FilesDev Tools -
Reactive Resume: Open-source resume builder that simplifies the process of creating, updating, and sharing your resume Open-source resume builder that simplifies the process of creating, updating, and sharing your resume. -
Read You: Android RSS reader presented in Material You style Android RSS reader presented in Material You style.Productivity -
Readarr: Book manager and automation tool Book manager and automation tool.MediaHome AutoProductivity -
Readeck: Simple web application that lets you save the precious readable content of web pages you like and want to keep forever Simple web application that lets you save the precious readable content of web pages you like and want to keep forever.Dev ToolsProductivity -
Receipt Wrangler: Self-Hosted Receipt Management A self-hosted receipt manager that scans, OCRs, and categorizes receipts, splits expenses between people, and keeps the records on your own server.Finance -
RecipeSage: Collaborative recipe keeper, meal planner, and shopping list organizer Collaborative recipe keeper, meal planner, and shopping list organizer.Dev Tools -
Recyclarr: Sync TRaSH Guides Settings to Sonarr and Radarr A command-line tool that keeps Sonarr and Radarr quality profiles, custom formats, quality definitions, and naming in line with the community TRaSH Guides, run on a schedule. MIT licensed.Files -
Redict: Distributed key/value store and independent fork Distributed key/value store and independent fork of Redis. -
Redlib: Private frontend for Reddit Private frontend for Reddit. -
Redmine: The Veteran Open Source Issue Tracker and Project Manager A flexible Ruby on Rails project management and issue tracking application with multiple projects, custom fields and workflows, Gantt charts, wikis, time tracking, and a large plugin ecosystem. GPL-2.0.Productivity -
Reiverr: Clean, combined interface for Jellyfin, TMDB, Radarr, and Sonarr Clean, combined interface for Jellyfin, TMDB, Radarr, and Sonarr.Media -
Replex: What You Need to Know: Proxy for transforming the communication between a Plex server and clients Proxy for transforming the communication between a Plex server and clients.MediaSecurity -
Requestly: Developer tool for frontend developers and QAs to build, test, and debug web apps faster by intercepting and modifying network traffic Developer tool for frontend developers and QAs to build, test, and debug web apps faster by intercepting and modifying network traffic. -
Restic: Fast, Encrypted, Deduplicating Backups A single-binary backup program with client-side encryption, deduplication, and support for many storage backends including S3, SFTP, and local disks.Files -
Restreamer: Complete streaming server solution for self-hosting with a visually appearing interface and no ongoing license costs Complete streaming server solution for self-hosting with a visually appearing interface and no ongoing license costs.Media -
Revolt: A Self-Hostable Discord Alternative A chat platform modelled closely on Discord, with servers, channels, roles and voice, built as open source and self-hostable for communities that want the same shape without the hosted service.Communication -
Rhasspy: Offline private voice assistant for many human Offline private voice assistant for many human languages.Home Auto -
Rocket.Chat: Fully customizable communications platform with high standards of data protection Fully customizable communications platform with high standards of data protection.Communication -
RomM: Beautiful, powerful, self-hosted ROM manager Beautiful, powerful, self-hosted ROM manager. -
Roundcube: Browser-based multilingual IMAP client with an application-like user interface Browser-based multilingual IMAP client with an application-like user interface.Communication -
Roundup: Issue-tracking tool for bugs, help desks, agile Issue-tracking tool for bugs, help desks, agile development, customer issues, and more. -
RSS Bridge: RSS feeds for websites missing them RSS feeds for websites missing them. -
RSS Translator: Open-source RSS translation tool for subscribing Open-source RSS translation tool for subscribing to translated RSS feeds. -
RSS: Simple Twitter-feed-style RSS aggregator Simple Twitter-feed-style RSS aggregator. -
RSSHub: Open-source, easy-to-use, and extensible RSS feed Open-source, easy-to-use, and extensible RSS feed generator capable of generating feeds from everything. -
Ruddarr: Native iOS Client for Radarr and Sonarr A native iOS and iPadOS companion app for managing Radarr and Sonarr instances, with push notifications for downloads and a proper mobile interface over the web UI. -
Rundeck: Open-source automation service with a web console, command line tools, and web API Open-source automation service with a web console, command line tools, and web API.Home AutoDev Tools -
RustDesk: Self-Hosted Remote Desktop An open-source remote desktop application and TeamViewer alternative that can run entirely on your own relay and ID servers, with clients for every major platform.Communication -
RustFS: S3-Compatible Object Storage Written in Rust A high-performance, distributed, S3-compatible object storage server written in Rust and licensed Apache 2.0, which reached 1.0 in September 2026 and is positioned as a MinIO alternative.Files -
ruTorrent: A Web Interface for rTorrent The long-standing PHP web front end for the rTorrent client, adding a plugin system, RSS downloading and remote management to a client that otherwise lives in a terminal. -
Rybbit: Privacy-Friendly Web Analytics With Session Replay and Funnels An open source, cookieless Google Analytics alternative built on ClickHouse with real-time dashboards, session replays, funnels, retention, user journeys, and custom events.Monitoring -
Ryot: Platform for tracking various facets of your life A self-hosted platform for tracking various facets of your life. -
SABnzbd: Usenet Download Automation A Usenet binary downloader that handles NZB files, par2 repair, and unpacking automatically, integrating with the *arr stack for hands-off media acquisition.MediaFilesHome Auto -
sabre/dav: CalDAV, CardDAV, and WebDAV framework CalDAV, CardDAV, and WebDAV framework.Files -
Saltcorn: What You Need to Know: Extensible open-source no-code database Extensible open-source no-code database application builder.Dev Tools -
Scraperr: Web application for scraping data from web pages Web application for scraping data from web pages.Dev Tools -
Scrutiny: Hard Drive S.M.A.R.T Monitoring A web dashboard for hard drive health, tracking S.M.A.R.T. attributes over time with real-world failure thresholds and alerting.FilesMonitoring -
Scrypted: Home video integration and automation platform Home video integration and automation platform.MediaHome Auto -
Seafile: High performance file syncing and sharing High performance file syncing and sharing.FilesDev Tools -
SearXNG: A Private Metasearch Engine You Run Yourself Aggregates results from many search engines without profiling you, tracking queries, or serving ads, and provides the search backend that several self-hosted AI tools depend on. -
SeaweedFS: A Distributed File System and S3 Store Built for Billions of Files A scalable distributed storage system in Go with O(1) disk access, S3-compatible object storage, FUSE mounts, WebDAV, SFTP, erasure coding, and replication, designed to handle huge numbers of small files.Files -
Secure ShellFish: SSH Terminal and File Access for iOS An iOS and macOS SSH client that also mounts remote servers in the Files app, bringing terminal access and file browsing to Apple devices.Files -
SecureAI Tools: Private and secure AI tools for everyone's Private and secure AI tools for everyone's productivity. -
seelf: Lightweight self-hosted deployment platform written in Go Lightweight self-hosted deployment platform written in Go.Dev Tools -
Seerr: Media Requests for Plex, Jellyfin, and Emby (Overseerr + Jellyseerr) The merged successor to Overseerr and Jellyseerr: one request manager where users discover and request movies and shows, with Sonarr and Radarr integration, permissions, and notifications, for Plex, Jellyfin, and Emby. MIT.MediaSecurity -
Self-Hosted Gateway: What You Need to Know: Self-hosted Docker native tunneling to localhost Self-hosted Docker native tunneling to localhost.Dev Tools -
Semaphore UI: Web Interface for Ansible and Terraform A modern web UI and API for running Ansible playbooks, Terraform and OpenTofu code, and Bash or PowerShell scripts, with scheduling, inventory, and access control.MediaDev Tools -
Sentry: Developer-first error tracking and performance Developer-first error tracking and performance monitoring.Monitoring -
SerpBear: Open-source search engine position tracking and keyword research app Open-source search engine position tracking and keyword research app. -
Server Cat: Server Status, Docker, and SSH for iOS An iOS application combining server monitoring, Docker container management, and an SSH client in one interface for people running their own machines.MonitoringDev Tools -
SFTPGo: Fully featured and highly configurable SFTP server Fully featured and highly configurable SFTP server.Files -
Shaarli: Personal, minimalist, super-fast, database free, bookmarking service Personal, minimalist, super-fast, database free, bookmarking service.MediaProductivity -
Share to Mealie: Share recipes to your self-hosted Mealie instance Share recipes to your self-hosted Mealie instance directly from your phone.FilesDev Tools -
Shared Moments: website designed for couples to capture and preserve their special moments A website designed for couples to capture and preserve their special moments.FilesDev Tools -
SheetAble: Self-hosted music sheet organizing software Self-hosted music sheet organizing software.Media -
ShelfPlayer: Audiobookshelf Client for Apple Devices A native iOS, iPadOS, and CarPlay client for Audiobookshelf with offline downloads, chapter navigation, and progress sync.MediaFiles -
ShellHub: Centralized SSH gateway that allows users to remotely access and manage their services from anywhere Centralized SSH gateway that allows users to remotely access and manage their services from anywhere. -
Shinobi: The next generation in open-source video management software The next generation in open-source video management software.Media -
Shiori: Simple bookmark manager Simple bookmark manager.MediaProductivity -
Shlink Manager: See and manage all shortened URLs created with Shlink See and manage all shortened URLs created with Shlink. -
Shlink: Definitive self-hosted URL shortener The definitive self-hosted URL shortener. -
ShotShare: Open-source image sharing application Open-source image sharing application.Files -
SigNoz: OpenTelemetry-Native Observability for Traces, Metrics, and Logs An open source alternative to Datadog and New Relic that collects traces, metrics, and logs through OpenTelemetry and stores them in ClickHouse, with APM dashboards, alerts, and correlation between signals.Monitoring -
Silicon Notes: Web-based personal knowledge base with few frills Web-based personal knowledge base with few frills.Productivity -
SilverBullet: Note-taking application optimized for people with a hacker mindset Note-taking application optimized for people with a hacker mindset.Productivity -
SimpleX Chat: First messaging network operating without user The first messaging network operating without user identifiers of any kind.MediaCommunication -
Sink: Simple, speedy, secure link shortener with analytics and deployed with Cloudflare Simple, speedy, secure link shortener with analytics and deployed with Cloudflare.FilesMonitoringDev Tools -
SiYuan: Privacy-first, self-hosted, fully open-source personal knowledge management software Privacy-first, self-hosted, fully open-source personal knowledge management software.Productivity -
Slash: Open-source, self-hosted links shortener and sharing platform Open-source, self-hosted links shortener and sharing platform. -
Slink: Self-hosted image sharing platform Self-hosted image sharing platform. -
SmokePing: Latency logging, graphing, and alerts Latency logging, graphing, and alerts.Monitoring -
SnappyMail: A Fast, Modern Webmail Client Forked From RainLoop A lightweight PHP webmail client with no database required, a modern interface, dark mode, Sieve filter editing, and OpenPGP encryption, as the maintained successor to RainLoop. Also available as a Nextcloud app. AGPL-3.0.FilesSecurityCommunication -
Snikket: Simple Self-Hosted Messaging for Small Groups An easy-to-deploy XMPP messaging service for families and small groups, bundling server, apps, and invitation flow into one opinionated package.Dev Tools -
Snipe-IT: Open Source IT Asset Management A mature self-hosted IT asset management system for tracking hardware, licenses, accessories, and consumables, with checkout to users and audit history.Security -
So Many People Self-Host Joplin: Secure note-taking and to-do app with synchronization capabilities Secure note-taking and to-do app with synchronization capabilities.FilesProductivity -
SoftEther VPN: A Multi-Protocol VPN Server A VPN server speaking its own protocol plus OpenVPN, L2TP/IPsec, SSTP and EtherIP, with the unusual ability to tunnel over HTTPS to traverse restrictive networks.Security -
solidtime: A Modern Open Source Time Tracker for Freelancers and Agencies A self-hostable time tracker with projects, tasks, clients, billable rates, multiple organizations, role-based permissions, and import from Toggl and Clockify.Dev ToolsProductivity -
SonarQube: Code quality and security solution with deep Code quality and security solution with deep integration for enterprise environments.Dev Tools -
Sonarr: Automated TV Series Management A PVR for Usenet and torrent users that monitors TV series, grabs new episodes as they are released, and renames and files them into a media library.MediaFilesMonitoring -
SonaShow: Web GUI for finding similar shows to selected Web GUI for finding similar shows to selected Sonarr shows.Files -
Speaches: An OpenAI-Compatible Speech-to-Text and Text-to-Speech Server Self-hosted speech API with OpenAI-compatible endpoints: transcription and translation with faster-whisper, and speech generation with Piper and Kokoro, on CPU or GPU. Described as Ollama for speech models. MIT.Dev Tools -
Specifically Clementines: Self-Hosted Grocery List A deliberately simple self-hosted shared grocery list, designed for a household to add and check off items in real time without an account on a commercial service.FilesDev ToolsFinance -
Speedtest Tracker: Automated Internet Speed Tests With History and Alerts A self-hosted app that runs Ookla speed tests on a schedule, records download, upload, ping, and packet loss over time, and notifies you when your connection drops below a threshold.Monitoring -
Sshwifty: Web SSH & Telnet client Web SSH & Telnet client. -
Stable Diffusion WebUI: Local Image Generation The AUTOMATIC1111 web interface for Stable Diffusion, giving local text-to-image generation with inpainting, upscaling, ControlNet, and an extension ecosystem. -
Stalwart Mail Server: Secure and modern all-in-one mail server Secure and modern all-in-one mail server.Communication -
Standard Notes: End-to-end encrypted note-taking app for digitalists and professionals End-to-end encrypted note-taking app for digitalists and professionals.Dev ToolsProductivity -
Statping-ng: Easy-to-use status page for websites and applications Easy-to-use status page for websites and applications.Monitoring -
step-ca: Online certificate authority for secure, automated Online certificate authority for secure, automated certificate management.Security -
Stirling PDF: Self-Hosted PDF Toolkit A web-based PDF utility offering merging, splitting, conversion, OCR, compression, and editing, keeping documents on your own server instead of an upload site.Productivity -
Stoat (Formerly Revolt): An Open Source, Self-Hostable Discord Alternative A privacy-focused chat platform with servers, channels, roles, voice, and bots, written in Rust and licensed AGPL-3.0. Renamed from Revolt to Stoat on October 1, 2025 after a trademark dispute; accounts and servers carried over.CommunicationFinance -
Strapi: The Popular Open Source Headless CMS A self-hosted headless CMS with a visual content-type builder, auto-generated REST and GraphQL APIs, role-based permissions, a media library, i18n, and draft and publish workflows. Node.js, MIT community edition.MediaDev Tools -
Streamyfin: A Modern Jellyfin Client for iOS, Android, and TV An alternative Jellyfin app built with React Native, with offline downloads, skip intro and credits, trickplay previews, Chromecast, and Seerr requests built in. MPL-2.0.Media -
Stump: Free and open-source comics, manga, and digital Free and open-source comics, manga, and digital book server with OPDS support.MediaDev Tools -
Subvert: Generate subtitles, summaries, and chapters from videos in seconds Generate subtitles, summaries, and chapters from videos in seconds.Media -
SuiteCRM: The SugarCRM Community Successor A full-featured CRM forked from SugarCRM Community Edition, adding quotes, invoices, contracts, events and project management on top of the standard sales pipeline.SecurityDev ToolsFinanceProductivity -
sup3rS3cretMes5age: Simple, secure self-destructing message service Simple, secure self-destructing message service. -
Supabase: Open-source based platform for backend development Open-source based platform for backend development solutions. -
Supersonic: Lightweight cross-platform desktop client for Subsonic and Jellyfin music servers Lightweight cross-platform desktop client for Subsonic and Jellyfin music servers.Media -
Sure: The Community-Maintained Fork of Maybe Finance A self-hosted personal finance and net worth tracker continuing the Maybe codebase after the original project was archived in July 2025. AGPL-3.0, deployable with Docker.Dev ToolsFinanceProductivity -
Suricata: Network Intrusion Detection and Prevention Inspects network traffic against signature rules to detect and optionally block malicious activity, with protocol analysis, file extraction, and TLS metadata logging.FilesMonitoringDev Tools -
SWAG: NGINX webserver and reverse proxy with built-in Certbot and Fail2Ban NGINX webserver and reverse proxy with built-in Certbot and Fail2Ban.Security -
Swetrix: Open-source and privacy-focused cookieless Open-source and privacy-focused cookieless alternative to Google Analytics.Monitoring -
Swift Paperless: Native iOS app for interacting with a Paperless-ngx installation Native iOS app for interacting with a Paperless-ngx installation. -
Swiftfin: Native Jellyfin client for iOS and tvOS Native Jellyfin client for iOS and tvOS.Media -
Syft: What You Need to Know: CLI tool for generating a software bill of materials from container images CLI tool for generating a software bill of materials from container images. -
Symfonium: Android Player for Self-Hosted Music Servers An Android music player that connects to Plex, Jellyfin, Emby, Subsonic-compatible servers, and local files, unifying multiple sources in one library.MediaFiles -
Synapse: Open-source Matrix homeserver written and maintained by the Matrix.org Foundation Open-source Matrix homeserver written and maintained by the Matrix.org Foundation.Home AutoCommunication -
Syncthing: Peer-to-Peer File Synchronization Continuous file synchronization between your own devices over an encrypted peer-to-peer connection, with no central server and no cloud account.FilesFinance -
Tabby: A Self-Hosted Coding Assistant An open-source code completion server that runs on your own hardware, with editor extensions for VS Code, JetBrains, and Vim, and no code leaving your network.Dev Tools -
Taiga: Agile Project Management With Scrum and Kanban An open source project management platform for agile teams with Scrum backlogs and sprints, Kanban boards, epics, issues, wikis, and importers from Jira, Trello, GitHub, and GitLab. MPL-2.0, deployed with Docker Compose.MonitoringDev ToolsCommunicationProductivity -
Tailscale: Private WireGuard networks made easy Private WireGuard networks made easy. -
Tamari: Fully-featured recipe manager web application Fully-featured recipe manager web application.Dev Tools -
Tandoor Recipes: Application for managing recipes, planning meals, building shopping lists and much much more Application for managing recipes, planning meals, building shopping lists and much much more.Dev Tools -
Tasks.md: Self-hosted, Markdown file based task management board Self-hosted, Markdown file based task management board.FilesProductivity -
Tauticord: Discord bot for displaying live data from Tautulli Discord bot for displaying live data from Tautulli.Communication -
Tautulli Remote: Mobile Client for Plex Monitoring A cross-platform mobile client for Tautulli, showing Plex activity, history, and library statistics from a phone, with notification support.MediaMonitoring -
Tautulli: Plex Monitoring and Statistics A monitoring and analytics companion for Plex Media Server, tracking who watches what, server load, and history, with extensive notification support.MediaMonitoring -
Tdarr: Distributed transcode automation Distributed transcode automation.Home AutoDev Tools -
Teable: A Self-Hosted Airtable Alternative Built on PostgreSQL A spreadsheet-style database with grid, form, kanban, gallery, and calendar views, real-time collaboration, and AI features, storing everything in PostgreSQL. The undb project merged into it in 2026.MediaCommunicationProductivity -
Technitium DNS Server: Recursive DNS, Ad Blocking, and Authoritative Zones in One A full-featured self-hosted DNS server with a recursive resolver, authoritative zones, DNS-level ad blocking, DNS over HTTPS, TLS, and QUIC, DNSSEC, a DHCP server, and clustering.Security -
Teemii: Self-hosted manga reader and manager with extensible agent-based metadata retrieval Self-hosted manga reader and manager with extensible agent-based metadata retrieval.Productivity -
Teleport: Provides connectivity, authentication, access Provides connectivity, authentication, access controls, and audit for infrastructure.Security -
Tempo: Open source and lightweight music client for Subsonic and built natively for Android Open source and lightweight music client for Subsonic and built natively for Android.Media -
Termius: Cross-Platform SSH Client A modern SSH client for desktop and mobile with synced hosts, saved snippets, and SFTP, used to reach servers you host yourself.Files -
Text Generation WebUI: A Local LLM Interface With Many Backends A web interface for running language models locally, supporting multiple inference backends and quantisation formats, with chat, notebook and raw completion modes.MediaCommunicationProductivity -
Thanos: Long-Term Storage and Global Query for Prometheus A set of components that give Prometheus unlimited retention in object storage, a single query view across many servers, and deduplication of highly available pairs.FilesMonitoring -
TiddlyWiki: Self-contained JavaScript wiki for the browser Self-contained JavaScript wiki for the browser.Productivity -
Tiny Tiny RSS: Free and open-source, web-based news feed reader Free and open-source, web-based news feed reader and aggregator.Productivity -
Tinyauth: A Tiny Login Screen for Any App Behind Your Reverse Proxy A small, OpenID certified authentication server and forward-auth middleware for Traefik, Caddy, and Nginx, with OAuth and LDAP login, TOTP, and access controls.SecurityMonitoring -
Tipi: Homeserver with one-click installs for self-hosted apps Homeserver with a simple setup and one-click installs for your favorite self-hosted apps.Home Auto -
ToolJet: Low-code platform for building internal applications Low-code platform for building internal applications.Dev Tools -
Traccar: Open-source GPS tracking system Open-source GPS tracking system. -
Tracearr: Monitoring, Account-Sharing Detection, and Newsletters for Plex, Jellyfin, and Emby A real-time dashboard for Plex, Jellyfin, and Emby servers that tracks sessions, flags suspicious account sharing with impossible-travel checks, runs automations, and sends scheduled newsletters.MediaMonitoringHome AutoDev ToolsFinance -
Traefik: Dynamic Reverse Proxy for Containers A cloud-native reverse proxy and load balancer that configures itself from Docker labels and other service registries, with automatic HTTPS.FilesSecurityDev Tools -
Traggo: Self-hosted, tag-based time tracking Self-hosted, tag-based time tracking. -
Transmission: Lightweight BitTorrent Client A minimal, resource-efficient BitTorrent client with a clean web interface, long favoured on NAS devices and low-powered servers.FilesDev Tools -
Trilium: Hierarchical note taking application with focus on building large personal knowledge bases Hierarchical note taking application with focus on building large personal knowledge bases.Productivity -
Trivy: Scanning Containers, Filesystems, and Code for Known Vulnerabilities A single scanner covering container images, filesystems, Git repositories, Kubernetes clusters, and infrastructure as code, checking dependencies against vulnerability databases and finding leaked secrets.FilesSecurityDev Tools -
Tube Archivist: Self-hosted YouTube media server Self-hosted YouTube media server.Media -
Tunarr: Build Live TV Channels From Your Plex, Jellyfin, or Emby Library Creates scheduled live TV channels from your own media, served as a virtual HDHomeRun tuner and M3U/IPTV stream with an XMLTV guide, filler content, and hardware-accelerated transcoding.MediaHome Auto -
Tuwunel: A High-Performance Matrix Homeserver, Successor to conduwuit A featureful Matrix homeserver in Rust that aims to fully implement the Matrix specification as a lighter alternative to Synapse. The official successor to conduwuit, sponsored by the Swiss government. Apache 2.0.SecurityHome AutoDev ToolsCommunication -
Tvheadend: TV streaming server and digital video recorder TV streaming server and digital video recorder.MediaDev Tools -
Typesense: Typo-Tolerant Search in a Single Binary A search engine optimised for instant, typo-tolerant results with a simple API, positioned as a lighter alternative to Elasticsearch for application search rather than log analytics.MonitoringDev Tools -
UhuruPhotos: Modern mobile media gallery for LibrePhotos Modern mobile media gallery for LibrePhotos.Media -
UltimateHomeServer: Deploy the ultimate home server stack with K3s and Helm Deploy the ultimate home server stack with K3s and Helm.Home AutoDev Tools -
Umami: Simple, fast, privacy-focused alternative to Google Analytics Simple, fast, privacy-focused alternative to Google Analytics.Monitoring -
umbrelOS: Beautiful home server OS for self-hosting with an app store Beautiful home server OS for self-hosting with an app store.Home Auto -
Unbound: Validating, recursive, and caching DNS resolver Validating, recursive, and caching DNS resolver. -
Undb: Private first, unified, self-hosted no code database Private first, unified, self-hosted no code database.Dev Tools -
Unmanic: Automatically Optimise Your Media Library A library optimiser that watches your media folders and processes files that do not match your rules, such as transcoding to HEVC or removing unwanted audio tracks, through a plugin-driven FFmpeg pipeline.MediaFilesDev Tools -
Unpackerr: Automatic Archive Extraction for Sonarr, Radarr, and Lidarr A small daemon that extracts completed downloads packed as RAR, ZIP, 7z, tar, and disc images so the *arr apps can import them, then cleans up. Also works as a standalone watch-folder extractor. MIT licensed. -
UpSnap: Simple Wake-on-LAN application Simple Wake-on-LAN application. -
Uptime Kuma Manager: Mobile Client for Uptime Kuma A mobile client for Uptime Kuma that displays monitor status, incident history, and notifications from a self-hosted uptime monitoring instance.MonitoringDev Tools -
Uptime Kuma: Self-Hosted Uptime Monitoring A fast, attractive uptime monitor supporting HTTP, TCP, DNS, ping, and push checks, with status pages and notifications to more than ninety services.Monitoring -
Uptime Mate: Website uptime monitoring for the Apple Watch Website uptime monitoring for the Apple Watch.Monitoring -
UrBackup: Client-Server Backup With Image and File Modes A backup system with a central server and agents on clients, supporting both file-level and whole-disk image backups, with deduplication and a web interface for restores.Files -
URL-to-PNG: URL to PNG utility featuring parallel rendering URL to PNG utility featuring parallel rendering using Playwright for screenshots and with storage caching via Local, S3, or CouchDB.Files -
Valkey: High-performance data structure server for serving High-performance data structure server for serving key/value workloads. -
Varys for Plex: Plex Server Monitoring on iOS An iOS app for monitoring Plex Media Server activity, sessions, and library health from a phone.MediaMonitoring -
Vaultwarden: Lightweight Bitwarden-Compatible Server An unofficial Bitwarden server implementation written in Rust, running the full feature set on minimal hardware and working with all official Bitwarden clients.SecurityDev Tools -
Vector: High-performance observability data pipeline High-performance observability data pipeline.Dev Tools -
Verdaccio: A Lightweight Private npm Registry and Cache A zero-configuration private npm registry that hosts your own packages and caches public ones from npmjs.org, with uplinks, access control, and storage plugins. Used by Babel, pnpm, and Angular CLI for testing. MIT.FilesDev Tools -
VictoriaMetrics: Fast, cost-effective monitoring solution and time Fast, cost-effective monitoring solution and time series database.Monitoring -
Vikunja: Self-Hosted Task and Project Management An open-source to-do and project management application with list, Gantt, table, and kanban views, plus reminders, labels, and team sharing.CommunicationProductivity -
Viseron: Self-hosted, local only NVR and AI computer vision Self-hosted, local only NVR and AI computer vision software. -
vLLM: High-Throughput Inference for Serving Many Users A GPU inference server built for throughput rather than convenience, using PagedAttention to serve many concurrent requests efficiently. The right tool when one model must serve a team.Dev ToolsCommunication -
Voilib: Self-Hosted Podcast Search Engine A self-hosted podcast search engine that transcribes episodes locally and makes their spoken content full-text searchable.Media -
Voltaserve: Upload files, search and preview documents, create groups and organizations, assign permissions and collaborate in real-time Upload files, search and preview documents, create groups and organizations, assign permissions and collaborate in real-time.FilesProductivity -
VyOS: A Router Operating System With a Real CLI A Debian-based network operating system with a unified configuration model and commit-confirm workflow, intended as an open alternative to commercial router and firewall appliances.SecurityDev Tools -
Wallabag: Save web pages for later reading Save web pages for later reading.Productivity -
Wallos: Open-source personal subscription tracker Open-source personal subscription tracker. -
Wanderer: Self-hosted trail database Self-hosted trail database. -
Watcharr: Self-Hosted Watch List for Film and TV A self-hosted watch list and tracker for films and television, with ratings, progress tracking, and import from commercial tracking services.Dev Tools -
Watchtower: Automatic Docker Container Updates A container that watches for new images of your running containers and updates them automatically, with notification and scheduling options.Dev Tools -
WatchYourLAN: Lightweight network IP scanner with web GUI Lightweight network IP scanner with web GUI. -
Waterfly III: Android Client for Firefly III An Android client for the Firefly III personal finance manager, adding quick transaction entry and account overviews to a self-hosted budgeting setup.Finance -
Wazuh: Open Source SIEM and Host Intrusion Detection Agents on each machine collect logs, monitor file integrity, check configuration against benchmarks, and detect intrusions, reporting to a central server with dashboards and alerting.FilesMonitoring -
Weaviate: A Vector Database With Built-In Vectorisation A vector search engine that can generate embeddings itself through pluggable modules, offers hybrid keyword and vector search, and exposes a GraphQL API alongside REST.Dev Tools -
Web-Check: Comprehensive, on-demand open source intelligence Comprehensive, on-demand open source intelligence for any website. -
Webmin: Full-Featured Linux Server Control Panel A long-running web-based system administration panel for Unix-like servers, covering users, packages, DNS, mail, firewalls, databases, and hundreds of services through modules.SecurityCommunication -
Webtop: Linux containers containing full desktop Linux containers containing full desktop environments in officially supported flavors accessible via any modern web browser.Dev Tools -
webtrees: Online collaborative genealogy application Online collaborative genealogy application.Monitoring -
WeKan: Open-source, customizable, and privacy-focused Open-source, customizable, and privacy-focused kanban.Productivity -
WeTTY: Terminal access in browser over HTTP/HTTPS Terminal access in browser over HTTP/HTTPS. -
wg-easy: WireGuard VPN With a Web Interface The simplest way to run WireGuard, combining the VPN server with a web UI for creating clients and displaying QR codes for mobile setup.SecurityDev Tools -
wger: Fitness, workout, nutrition, and weight tracker Fitness, workout, nutrition, and weight tracker. -
Whaledeck: Lightweight Docker Management Interface A user-friendly web interface for managing Docker containers, aimed at people who find Portainer heavier than their setup requires.Dev Tools -
What''''''''s Up Docker?: Notifications for Docker image updates Notifications for Docker image updates.Dev Tools -
Whishper: Local Audio Transcription and Subtitles With Whisper A self-hosted web app that transcribes audio and video with faster-whisper, exports text and subtitle formats, includes a subtitle editor, and translates through LibreTranslate. AGPL-3.0; a v4 rewrite is in progress.Media -
whisper.cpp: Local Speech Transcription Without a Cloud A C++ port of OpenAI Whisper that transcribes audio on CPU or GPU with no Python stack, suitable for meeting recordings, podcasts, and subtitle generation on your own hardware.MediaFiles -
Whoogle: Self-hosted, ad-free, privacy-respecting Self-hosted, ad-free, privacy-respecting metasearch engine. -
Wiki.js: modern, lightweight and powerful wiki app built on NodeJS A modern, lightweight and powerful wiki app built on NodeJS.Productivity -
Willow: Open-source, local, and self-hosted voice Open-source, local, and self-hosted voice assistant alternative. -
Windmill: Turn Scripts Into Workflows and UIs A developer platform that takes scripts in Python, TypeScript, Go or Bash and gives them auto-generated UIs, schedules, webhooks and a flow builder for composing them.Dev Tools -
Wizarr: User invitation management system for Jellyfin, Plex, and Emby User invitation management system for Jellyfin, Plex, and Emby.Media -
WooCommerce: Customizable, open-source ecommerce platform built on WordPress Customizable, open-source ecommerce platform built on WordPress. -
Woodpecker CI: Lightweight Container-Native CI A simple, container-native continuous integration engine that runs every pipeline step in a Docker container, configured by a YAML file in your repository.FilesDev Tools -
WordPress: Web content management system Web content management system. -
Worklenz: Open-source project management tool for efficient Open-source project management tool for efficient teams.Dev ToolsCommunicationProductivity -
Workout Tracker: Workout tracking web application for personal use, geared towards running and other GPX-based activities Workout tracking web application for personal use, geared towards running and other GPX-based activities. -
WriteFreely: Clean, Markdown-based publishing platform made for writers Clean, Markdown-based publishing platform made for writers. -
xBackBone: Lightweight file manager with full ShareX support Lightweight file manager with full ShareX support.Files -
Yamtrack: Self-Hosted Media Tracker A self-hosted tracker covering films, television, anime, manga, books, and games in one place, with import from popular tracking services.Media -
yarr: Web-based feed aggregator Web-based feed aggregator. -
Yattee: Privacy-oriented video player for Apple devices Privacy-oriented video player for Apple devices.Media -
Your Spotify: Self-hosted Spotify tracking dashboard Self-hosted Spotify tracking dashboard.Monitoring -
YOURLS: Your Own URL Shortener Your Own URL Shortener. -
YoutubeDL-Material: Self-hosted YouTube downloader built on Material Self-hosted YouTube downloader built on Material Design. -
YunoHost: Self-Hosting Distribution With an App Catalogue A Debian-based server distribution designed to make self-hosting accessible, bundling user accounts, SSO, email, certificates, and a catalogue of one-click applications.SecurityMonitoringCommunicationFinance -
Zabbix: Real-time monitoring of IT components and services Real-time monitoring of IT components and services including networks, servers, VMs, applications, and the cloud.FilesMonitoring -
Zammad: Web-based open-source helpdesk/customer support Web-based open-source helpdesk/customer support system. -
Zeek: Turning Network Traffic Into Structured Logs Formerly Bro, a network analysis framework that produces detailed structured logs of every connection, DNS query, TLS handshake, and file transfer, with a scripting language for custom analysis.FilesMonitoring -
ZeroTier: A Virtual Ethernet Switch Across the Internet A peer-to-peer mesh network presenting itself as a virtual layer 2 Ethernet switch, so joined devices behave as though on the same LAN regardless of where they are. -
Zigbee2MQTT: Vendor-Free Zigbee Bridge A bridge that connects Zigbee devices to MQTT, freeing them from proprietary hubs and making them available to any home automation platform.Home Auto -
ZipCaptions: Generate text from a given audio source using only Generate text from a given audio source using only your browser.Media -
Zipline: Next generation ShareX/file upload server Next generation ShareX/file upload server.Files -
Zitadel: Identity infrastructure simplified Identity infrastructure simplified.Security -
Zola: Fast static site generator in a single binary with everything built-in Fast static site generator in a single binary with everything built-in.Monitoring -
ZoneMinder: Free, open-source closed-circuit television Free, open-source closed-circuit television software application.Dev Tools -
Zoraxy: A Reverse Proxy With a Web UI, Stream Proxying, and GeoIP Blocking A general-purpose reverse proxy written in Go with automatic ACME certificates, TCP and UDP stream proxying, GeoIP allow and block lists, uptime monitoring, a web SSH terminal, and plugins.MediaSecurityMonitoring -
ZTNET: Self-hosted ZeroTier network controller Self-hosted ZeroTier network controller. -
Zulip: Threaded Team Chat An open-source team chat application organized around topics within streams, so conversations stay readable and catchable-up on rather than scrolling past.MediaCommunicationProductivity -
zwave-js-ui: Full featured Z-Wave control panel UI and MQTT Full featured Z-Wave control panel UI and MQTT gateway.Home Auto
No apps match your search.